Integral slide device and method of floor steel pipe column bracket of bridge end bay closure section construction

A technology of steel pipe column support and overall sliding, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of difficult operation of mechanical equipment, large material loss, long time period, etc., and save support disassembly procedures , less potential safety hazards, the effect of saving investment

Inactive Publication Date: 2012-05-02
CHINA FIRST METALLURGICAL GROUP
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Under the circumstances of this construction environment, for double-width bridges, after the construction of the half-width cast-in-place box girder is completed, if the support system is removed and the new support system is reinstalled when constructing the other half-width, it will not only take a long time, but also The mechanical equipment is difficult to operate and the material loss is also large

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Integral slide device and method of floor steel pipe column bracket of bridge end bay closure section construction
  • Integral slide device and method of floor steel pipe column bracket of bridge end bay closure section construction
  • Integral slide device and method of floor steel pipe column bracket of bridge end bay closure section construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] The present invention will be further described below in conjunction with the embodiments and accompanying drawings.

[0037] The overall sliding device of the bridge side-span closing section construction floor-to-ceiling steel pipe column support provided by the present invention has a structure such as figure 1 and figure 2 Shown: comprise expanding foundation 1, two sliding rails 5, sliding steel plate 20, stand and traction mechanism. Two sliding rails 5 are symmetrically arranged on the enlarged foundation 1, and a sliding steel plate 20 is arranged on each sliding rail, and the sliding steel plate can move on the sliding rail connected to it under the action of the traction mechanism The bottom of each sliding track is supported on the enlarged foundation 1 by a plurality of track leveling supports 4, and these supports have a leveling effect, so that the entire sliding track is horizontally arranged on the enlarged basis 1.

[0038] The stand is provided with...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to integral slip device and method of a floor steel pipe column bracket of a bridge end bay closure section construction. The device comprises a floorstand, a drawing mechanism and two slip tracks (5) symmetrically arranged on an expanded foundation (1), wherein two slip steel plates (20) are arranged on each slip track, and the slip steel plates move on the slip tracks under the action of the drawing mechanism; the lower parts of the slip tracks are supported on the expanded foundation (1) through a plurality of track leveling supporting seats (4); and the supporting seats have the effect of leveling and ensures that the whole tracks are horizontally arranged on the expanded foundation (1). The method comprises the following steps of: doing preparation works, measuring an elevation, mounting the floorstand and the drawing mechanism, implementing integral slip, and the like. The invention can effectively solve the problem of displacement of the whole bracket system in construction environments of large height and difficult going in and out of mechanical equipment and has the advantages of simple move mode, bracket dismounting procedure saving, turnover material loss reduction, construction period shortening, and the like.

Description

technical field [0001] The invention relates to an overall moving device for a support, in particular to an overall sliding device for a ground steel pipe column support in the construction of bridge side-span closing sections, and an overall displacement method for the support from one side of the bridge to the other side. Background technique [0002] The side spans of prestressed concrete continuous rigid frame bridges are usually located in tidal flat areas on the banks of rivers, and the geological conditions under the bridges are mostly soft strata, making it difficult for mechanical equipment to enter and exit. When the pier is in the waterless area of ​​the river bank, the construction of the side span closing section adopts the erection of floor-to-ceiling steel pipe column supports for cast-in-place construction. The foundation must be treated before the construction support of the cast-in-place section is erected to prevent the support system from settling. Under...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00
Inventor 呙于平李密良徐天营吴宗庆王春兰