Mobile grid task scheduling method based on energy and time constraint
A technology of time constraint and task scheduling, applied in the direction of resource allocation, multi-program device, etc., can solve the problems of the performance degradation of the scheduling system and the increase of the task completion time, so as to achieve the effect of good performance and reduced impact.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0015] Embodiments of the present invention will now be described with reference to the drawings, in which like reference numerals represent like elements.
[0016] Before the method of the present invention is described in detail, the resources and tasks in the mobile grid and the parameters used by the method are explained first.
[0017] Moving resources in the grid
[0018] The grid resources mentioned in the present invention mainly refer to mobile devices, such as smart phones, PDAs and laptops. A certain grid resource can also be called a machine, which can provide certain computing power, storage capacity and other grid services. We denote the k machines in the mobile grid as the resource set M={m 1 , m 2 ,...,m k}, each machine can only execute one grid task at a time, and cannot execute other tasks until the task is completed. In the scheduling process, it is assumed that the state information of the machine has been saved on a certain grid server. The status i...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com