Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

38 results about "Mobile grid" patented technology

System and method for automatic mesh generation from a system-level MEMS design

ActiveUS20050066301A1Rapid and efficient movementAvoiding considerable unnecessary computationDetecting faulty computer hardwareComputation using non-denominational number representationDecompositionEngineering
A mesh generation tool that is programmatically integrated with a system-level design and simulation environment, thereby enabling the direct generation of PDE solver input from a system-level design and simulation environment and a method for using the mesh generation tool are disclosed. Automatic mesh generation and optimization is improved by making available additional information about the nature and purpose of certain design components to the mesh generation tool. Specifically, the parameters of the components in the device schematic, which represent a user-defined decomposition of a larger MEMS design into smaller entities of clear physical purpose, are made available to the mesh generation tool. The link established between the system-level design and PDE analyses allows the user to move between the two levels of abstraction. The mesh generation tool retrieves information from the components and connectors of a schematic of a MEMS device, and produces a discrete element model suitable for numerical PDE analysis by the finite element (FEM) and boundary element (BEM) methods. A direct link from a schematic model to a mesh model helps the user to produce an optimal mesh for PDE analysis, thereby avoiding considerable unnecessary computation.
Owner:COVENTOR

Seepage simulation method for constructing coal body based on finite element-discrete element CT (Computer Tomography)

The invention discloses a seepage simulation method for constructing a coal body based on finite element-discrete element CT (Computer Tomography). The method comprises the following steps: performing industrial CT scanning to obtain a three-dimensional data body of the coal body, performing three-dimensional reconstruction, and removing an ''island block'' to obtain a general three-dimensional geometric model which can be called by simulation software; writing a coal body fracture discrimination algorithm by a discrete element simulation method, and determining whether the coal body is deformed, even fractured under the action of hydraulic pressure stress; meanwhile, realizing migration of coal body fragments formed after fracture in the coal body along with moisture flow based on an finite element simulation method by a mobile grid method; and performing numerical simulation of a moisture seepage pressure field, a seepage speed field and a coal body moisture increment at the same time in order to reveal deformation and fracture phenomena of the coal body and a migration rule of moisture in a water injection process of a porous medium coal bed to the maximum extent.
Owner:SHANDONG UNIV OF SCI & TECH

Spatial information service system based on geographical index

InactiveCN102222065AImprove resource location speedImprove the efficiency of resource servicesSpecial data processing applicationsRelevant informationDistributed index
The invention relates to a spatial information service based on a geographical index, comprising a grid server, a mobile client and a grid agent server; the grid server is provided with a first spatial information local index mechanism; the mobile client is provided with a second information local index mechanism; the grid agent server is provided with a globally distributed index mechanism; the grid server registers on the grid agent server, and simultaneously sends the relevant information of a respective spatial resource to the grid agent server; the grid agent server stores the global index information of the spatial resource of each grid server; the mobile client sends the request of spatial information mobile grid service to the grid agent server; and the grid agent server judges which grid server of requested data to send the request to the owned grid server according to the requested place information. Compared with the prior art, the spatial information service based on the geographical index has the advantages of promoting the locating speed of spatial information resources, and the like.
Owner:TONGJI UNIV

Extended Mobile Gird

The E-MoG, i.e. Extended Mobile Grid, invention is herein described as a decentralized and distributed “Cyber-physical and / or Mobile Cyber-physical System,” which may operate in connection with or semi-autonomous from or autonomously from the Internet, comprising a distributed homogeneous or heterogeneous plurality of wired and / or wirelessly interconnected stationary, portable, mobile, or self-mobile hosts, or devices, i.e. generically referred to as nodes, where the nodes' individual computation, communications, sensing, and / or actuation resources are collectivized for collaborative and / or collaborative-distributed computation and / or collaborative missions, i.e. mission processing, and / or collaborative-distributed missions, through the coordinating action of the E-MoG's distributed / decentralized software or middleware running onboard each node.
Owner:UNIVERSITY OF LOUISIANA AT LAFAYETTE

Resource organization system and resource query method applicable to wireless mobile grid

The invention provides a resource organization system and a resource query method applicable to a wireless mobile grid. The resource organization system is mainly divided into three levels including a local node internal resource information layer, a virtual fleet (VF) internal resource information layer and a whole network resource information layer between virtual fleets. When resource query is carried out, a local primary resource information high-speed cache is queried first, then a secondary resource information high-speed cache is selected and queried, and finally a local main-control command node sends inquiry requests to main-control command nodes of other VFs according to broadcast. According to the invention, the characteristics of a wireless communication system between wireless mobile grid nodes and the characteristics of resource utilization are fully utilized, the resource organization form is of a three-layer structure, and efficient resource organization and resource property query are achieved through a two-stage high-speed cache mechanism. Compared with the prior art, the invention greatly reduces the number of messages required by resource combination and query, and improves the efficiency of resource query and the anti-damage performance of resource organization and query.
Owner:NO 709 RES INST OF CHINA SHIPBUILDING IND CORP

Mobile grid task scheduling method based on energy and time constraint

The invention discloses a mobile grid task scheduling method based on energy and time constraint, which comprises the following steps: adding all resources in a grid to a resource set; for each task in a task set, obtaining the resources of which the total energy needed for completing the task is less than self residual available energy; obtaining the task execution time that the found resources execute the task so as to obtain expected completion time; and preferably scheduling a machine-task pair with the relatively short expected completion time. The method reduces the influence on the grid task scheduling caused by unstable network connection and the limited energy of equipment so that a grid scheduling system is capable of obtaining relatively good performances.
Owner:WUHAN UNIV OF TECH

Method for playing and enquiring mobile communication terminal image and sound based on mobile grid

The invention relates to an audio-video playing inquiry method for a mobile communication terminal based on a mobile grid, in particular to a mechanism which is used in the mobile communication terminal, uses the mobile grid as basis and carries out effective sorting on the mobile communication terminal according to a playing habit of a terminal user. A mobile terminal part adopts PDA of a pre-mounted WIN CE operating system and simultaneously pre-mounts client software of the grid. The mobile terminal is accessed to a grid WEB portal through wireless application based on a WAP protocol. A grid infrastructure part comprises a central server, a storage server, an information server and a digital media server and is provided with a GT4 software package. SS, IS and DMS can belong to different DOMAIN management domains respectively. The central server is realized through a high-performance server; the inside of the central server can realize service registration, management, binding and a series of service; the mobile terminal side is presented through a WEB portal form; and through the WEB portal, the user can access various grid service.
Owner:NANJING UNIV OF POSTS & TELECOMM

Electric stack simulation device for developing thermal management system of large-power fuel cell

ActiveCN108417867AImprove development efficiencySpeed ​​up the match testing processFuel cell controlMatching testLoop control
The invention relates to an electric stack simulation device for developing a thermal management system of a large-power fuel cell. Different heating powers of an electric stack are simulated by adjusting an energization state of open-loop control electric heating pipe group and an end voltage of a closed-loop control electric heating pipe, the flow resistance characteristic of a real electric stack is simulated by changing the layers of a filtering net of a resistance adjustment module, the thermal inertia and thermal resistance characteristics of the real electric stack are simulated by simulating a lamination structure of the fuel cell and by combining translation of a mobile grid plate, and the specific heat capacity characteristic of the real electric stack is simulated by controllingthe volume of a cooling liquid in the device. Compared with the prior art, the real electric stack can be substituted during the matching development process of the fuel cell thermal management system, and the electric stack simulation device has the advantages that the matching test process is accelerated and the development efficiency of the thermal management system is improved.
Owner:TONGJI UNIV

System and method for providing distributed virtual cloud using mobile grid

A system and method for providing a distributed virtual cloud by using a mobile grid are disclosed. The system for providing a distributed virtual cloud according to an exemplary embodiment of the present invention may include a social topology creating unit creating a social topology based upon social relationships between user equipments configuring a Social Network Service (SNS), a cluster configuration unit configuring a social topology cluster based upon closeness centrality between the user equipments configuring the Social Network Service (SNS), and a cloud interoperation unit performing interoperation between a virtual cloud corresponding to each social topology cluster and a cloud managing the social topology.
Owner:KOREA ADVANCED INST OF SCI & TECH

Novel computer-assisted removal method for dental crown preparation body undercut

The invention provides a novel computer-assisted removal method for a dental crown preparation body undercut. The novel computer-assisted removal method comprises the following steps of 1) calculatingan undercut area: calculating the undercut area in an in-place direction according to the specified in-place direction; 2) converting the undercut area: taking a return value of the undercut area asan index of a triangular surface, and converting the triangular surface into grid vertexes; 3) classifying the vertexes of the undercut area: classifying the grid vertexes of the undercut area, wherein the grid vertexes in the same classification have the same motion vector when the undercut area is removed; and (4) removing the undercut area: calculating the motion vector required for removing the undercut area of the grid vertexes in each classification according to a projection algorithm, and then moving the grid vertexes. According to the novel computer-aided removal method for the dentalcrown preparation body undercut provided by the invention, automatic removal of the undercut area can be realized without human interference, and a new undercut area does not appear, so that the design of a later-period restoration body is facilitated; the in-place direction is not limited; and the method is suitable for various dental crown preparation body models.
Owner:SHENZHEN UP3D TECH CO LTD

Safety management system applied to super computer room

The invention provides a safety management system applied to a super computer room. The safety management system comprises a central management platform, a mobile grid system, a camera monitoring system, an electronic access system, a remote monitoring system and an uninterruptible power supply system, wherein the mobile grid system, the camera monitoring system, the electronic access system, the remote monitoring system and the uninterruptible power supply system are respectively connected with the central management platform. The mobile grid system comprises a grid wall which is arranged outside the super computer room, a power supply, a transformer, grid wall scroll wheels which are arranged at the entrance of the grid wall, and an electronic lock which is controlled by the central management platform, is connected with the grid wall, and is used for controlling opening, closing and energization of the grid wall, wherein the power supply and the transformer are connected with the grid wall, and are used for protecting the power using of the grid wall. According to the invention, the subsystems are organically integrated; through the central management platform, integration management and function calling of grid energization management, access control and video monitoring are realized; dynamic deploying can be carried out on a super computer system in a jurisdiction; high safety control is ensured; and the safety management system meets industry work standards.
Owner:SHENZHEN INST OF ADVANCED TECH

System and method for geometric warping correction in projection mapping

A system and method for geometric warping correction in projection mapping is provided. A lower resolution mesh is applied to A mesh model, at least in a region of the mesh model misaligned with a corresponding region of a real-world object. One or more points of the lower resolution mesh are moved. In response, one or more corresponding points of the mesh model are moved to increase alignment between the region of the mesh model and the corresponding region of the real-world object. An updated mesh model is stored in a memory. And one or more projectors are controlled to projection map imagescorresponding to the updated mesh model onto the real-world object.
Owner:CHRISTIE DIGITAL SYST USA INC

Bean sprout both end portions removing method and bean sprouts treating devices therefor

The invention provides a bean sprout separating device, wherein the bean sprout separating device comprises a mobile grid transfer conveyor forming a plurality of grids which are arranged at certain intervals, and comprises a belt transfer conveyor operating below the grid transfer conveyor with a small interval between the grid transfer conveyor; the bean sprouts are fed to the grid transfer conveyor and are transferred in a scattered way, thus, bean sprouts in no less than predetermined length are left on grid transfer conveyor, while the bean sprouts in less than predetermined length are separated and removed from the transfer conveyor.
Owner:DAISEY MASCH CO LTD

Grid adaptive method for high-precision flow field analysis

The embodiment of the invention discloses a grid adaptive method for high-precision flow field analysis, relates to the field of flow field numerical simulation of fluid mechanics, and can improve the efficiency of a whole flow field analysis system and also improve the utilization rate of computing resources. The method comprises the following steps: establishing a flow field equation and calculating an initial flow field according to flow field information set by a client; constructing training data to train an AdaBoost classifier to classify grid nodes, and training a neural network for flow field solution prediction; constructing a measurement tensor by using the initial flow field solution and the classification result, and obtaining a new grid by constructing a grid equation; and predicting a flow field solution on the new grid by using a neural network for moving grid nodes in the next round, and returning a finally obtained result to a customer service end. The method is suitable for industrial design related to flow field numerical simulation.
Owner:NANJING UNIV OF AERONAUTICS & ASTRONAUTICS

Double-die punching device for accumulator pole plate punching net

The invention provides a double-die punching device for an accumulator pole plate punching net. The double-die punching device comprises a punching machine and a lead plate feeding and discharging rail; the lead plate feeding and discharging rail is arranged below the punching machine; two punching dies are arranged at the lower end of the punching machine, and punching forming of a pole plate isconducted through the two punching dies simultaneously; a pole plate turning guide rod is arranged on the right side of the lead plate feeding and discharging rail; pole plate fixing pressing blocks are arranged on the lead plate feeding and discharging rail, and a lead plate is fixed with the pole plate fixing pressing blocks; a winding roller is arranged on the right side of the pole plate turning guide rod; and a rotating motor is arranged at the lower end of the winding roller. The lead plate is punched through the two punching dies, so that the punching efficiency is improved; the lead plate is driven by the winding roller to move below the punching dies and fixed with the pole plate fixing pressing blocks, feeding and discharging work is automatically completed, labor occupation is avoided, and the equipment cost is low; and the wound pole plate is flattened through a pole plate flattening roller, thus the winding efficiency is improved, and the pole plate is prevented from beingdamaged due to extrusion.
Owner:TIANNENG BATTERY WUHU

Rotor wing type unmanned aerial vehicle aerodynamic parallel numerical simulation method

The invention discloses a rotor wing type unmanned aerial vehicle aerodynamic parallel numerical simulation method. The method comprises the following steps of (1) drawing a calculation model throughthree-dimensional CAD software, the calculation model is composed of a rotor wing and a helicopter body, the rotor wing is composed of three blades, the length of each blade is set to be 5.2 m, and only a flow field of the helicopter in a hovering state is calculated at the position; (2) setting a calculation area; according to the rotor wing type unmanned aerial vehicle aerodynamic parallel numerical simulation method, through model construction, a calculation area is set to perform grid division, simulating the relative movement of a rotor wing and a fuselage by moving a grid of a rotating area by using a moving grid technology at each time step, adding proper conditions at an interface to exchange information of a flow field, and then performing solving in a full coupling form to quickly obtain a numerical calculation result with high fidelity.
Owner:SHENZHEN INST FOR INNOVATIVE DESIGN CO LTD

A method and device for generating crater terrain based on Wally noise

ActiveCN107945274B3D modellingTerrainMeteorite craters
A method and device for generating crater terrain based on Wally noise, the method comprising the steps of: generating grid points according to a fixed step; randomly moving the grid points, and the moving distance is less than half of the fixed step; One-half of the distance between the grid point and the nearest grid point is used as the radius of a random circle with each grid point as the center of the circle, and a random circle is generated; based on the preset coordinate position and the preset height ratio value, Calculate the height value of the preset coordinate position; generate the crater terrain according to the height value of the preset coordinate position and a random circle. The crater terrain generation method and device based on Wally noise of the present invention outputs a height value corresponding to the sampling point based on the input coordinate value of a sampling point, so that craters can be randomly generated in the terrain scene, and then used to simulate The effect of craters or volcanic craters.
Owner:SNAIL GAMES

A ladle hot repair dust removal equipment

The invention discloses a ladle hot repair dedusting equipment, relates to the technical field of auxiliary equipment for the steel ladle hot repair, and solves the technical problems of poor smoke and dust pollution and dust removal effect and low efficiency during the steel ladle hot repair process. It includes a collection cover, a vacuum tube and a negative pressure tube. The capture cover is set on a movable fire baffle, and the area of ​​the capture cover covers the ladle mouth area; one end of the suction tube is connected to the capture cover; the negative pressure tube One end of the dust removal pipe is connected to the dust removal pipe network; the other end of the dust suction pipe is connected to or separated from the other end of the negative pressure pipe, and a sealing assembly is arranged between the dust suction pipe and the negative pressure pipe. In the present invention, a trapping cover is added to the movable fire baffle, so that the smoke and dust generated during the hot repair of the ladle are gathered in the trap, and the dust suction pipe is connected with the negative pressure pipe and compressed with the movement of the fire baffle. The smoke and dust are sucked into the dust removal pipe network to avoid the diffusion of smoke and dust; on the other hand, the sealing components between the dust suction pipe and the negative pressure pipe are compressed and sealed to avoid the loss of air volume in the dust removal pipe network and the leakage of smoke and dust.
Owner:BEIJING SHOUGANG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products