Multisection continuous observing method for feeding back tunnel surrounding rock deforming rule
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- CHINA UNIV OF MINING & TECH
- Publication Date
- 2010-07-07
- Estimated Expiration
- Not applicable · inactive patent
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention relates to a continuous observation method, in particular to a multi-section continuous observation method for feeding back the deformation law of the surrounding rock of the roadway supporting engineering. Background technique
[0002] As a channel for safe production in coal mines, the importance of mine pressure observation in roadways is self-evident. On the one hand, the reasonable control and maintenance of the roadway is related to the normal production of the mine and the life safety of the miners, and the accidents in the roadway are highly accidental and destructive, so daily mine pressure observations must be carried out to reflect the maintenance status of the surrounding rock. Take measures in time when abnormal situations occur; on the other hand, with the increase of coal mine mining depth, the control problems of deep and weak and broken surrounding rock roadways become more and more obvious, and the support technology nee...