A pipeline installation and construction method technology, which is applied in pipeline laying and maintenance, pipes/pipe joints/fittings, mechanical equipment, etc., can solve the problems of difficult installation quality assurance, long construction period, and large safety hazards, so as to reduce operating time, Improve work efficiency and reduce work intensity

Active Publication Date: 2010-08-25
中石化石油工程技术服务有限公司
View PDF6 Cites 17 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In order to solve the problems that in the existing U-shaped tunnel pipeline installation and construction method, the construction personnel install the whole process in the tunnel, the safety hazard is large, the construction period is long, and the installation quality is difficult to guarantee. The present invention provides a U-shaped tunnel pipeline installation and construction method. The pipe welding of the well section is done outside the tunnel

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Mounting and construction method of U-shaped tunnel pipelines
  • Mounting and construction method of U-shaped tunnel pipelines
  • Mounting and construction method of U-shaped tunnel pipelines

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0012] The U-shaped tunnel includes a left inclined shaft section, a flat road section and a right inclined shaft section. As shown in Fig. 1 and Fig. 2, the U-shaped tunnel pipeline installation and construction method of the present invention includes the following steps: firstly carry out the pipeline installation in the left inclined shaft section, at the same time carry out the pipeline transportation and distribution of the roadway section, and the roadway section transportation. After the pipe is finished, the pipe installation in the right inclined shaft section will be carried out, and finally it will be connected in the roadway section.

[0013] The pipeline installation steps of the inclined shaft section are as follows: (1) Lay a light rail at the bottom of the inclined shaft 4 of the tunnel as a guiding device for the pipeline to slide down; (2) Embed a ground anchor 1 in front of the tunnel entrance 4a that can carry the load of the pipeline to slide down, and Fix t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a mounting and construction method of U-shaped tunnel pipelines. The method comprises the following steps of: mounting pipelines of a left inclined shaft section firstly and meanwhile, carrying out pipeline transportation and distribution of a level section; after the pipeline transportation and distribution of the level section is finished, mounting pipelines of a right inclined shaft section; and finally, connecting the heads on the level section to run through, wherein the pipeline mounting of the inclined shaft sections comprises the following steps of: laying a light rail through the whole course at the bottom of the tunnel; then embedding a ground anchor, fixing a winding machine and beginning to excavate a working pit; mounting a hoop and a sled on a pipeline; connecting a pulley block with the ground anchor, the pipeline, the loop and the winding machine; ensuring that the pipeline downwards slides along the light rail through the sled until the upper port of the pipeline arrives at the working pit; then continuing to mount another pipeline; and repeating in such a way until the inclined shaft pipelines and the level pipelines are butt jointed. In the construction method, the operations of welding, flaw detecting and joint repairing aiming at the inclined shaft pipelines are all finished outside the port of the tunnel, thereby avoiding the construction in the tunnel, improving the construction safety, reducing the labor intensity and being beneficial to improving the welding quality, shortening the construction period and saving the construction cost.

Description

Technical field [0001] The invention relates to an installation and construction method for a large-diameter pipeline, in particular to an installation and construction method for a U-shaped tunnel pipeline with a long inclined shaft section. Background technique [0002] At present, for the installation of pipelines in U-shaped tunnels, the construction method is usually carried out one by one from bottom to top in the tunnel. The pipeline assembly, welding, flaw detection, and patch repair are all completed inside the tunnel. The methods are as follows Disadvantages: (1) The construction personnel carry out the pipeline installation and construction in the tunnel throughout the whole process, and the safety hazard is relatively large. Once there is poor ventilation, foreign objects or collapses, safety accidents will occur. The construction safety problems of the bare tunnel section and the initial support section are particularly prominent (2) The humidity in the tunnel is rel...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): F16L1/036F16L1/11
Inventor 温涛孟强王辉陈海泉
Owner 中石化石油工程技术服务有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products