Structure and method for jacking absorption tower from middle segment
An absorption tower and jacking technology, which is applied in the structural field of jacking in the middle, can solve the problems of long period, high crane requirements, and cost, and achieve the effect of enhancing desulfurization capacity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] Such as figure 1 , figure 2 , a jacking structure for the middle section of the absorption tower, in which a plurality of support columns 1 are welded on the outer wall below the cutting place where the middle section of the absorption tower is lifted, and a plurality of shrinkage columns 1 are welded on the outer wall above the cutting place where the middle section of the absorption tower is lifted The ring clamping plate 2 and the shrinking ring 3 are located below the clamping plate, and are tightened on the outer wall of the upper section 4 of the absorption tower. The support of the hydraulic jack 6 is fixedly installed on the support column 1, and its ejector rod supports the shrinking ring 3 from the bottom. Multiple hydraulic jacks are a complete set of equipment, controlled by a central hydraulic pump device, and the hydraulic systems of each hydraulic jack are connected to ensure that the hydraulic jacks move synchronously.
[0024] The shrink ring 3, such ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 