X60 pipe line steel and production method thereof
A technology of pipeline steel and steel plate, applied in the direction of temperature control, etc., to achieve the effect of good comprehensive performance, optimized product structure, and improved strength and toughness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0038] A. The slab with the following chemical composition: C 0.065wt%, Si 0.20wt%, Mn 1.40wt%, S 0.004wt%, P 0.015wt%, Nb 0.040wt%, V 0.045wt%, Ti 0.015wt%, N 0.006wt%, Als 0.025wt%, and the rest are Fe and unavoidable impurities, which are sent to a walking beam heating furnace with a temperature of 1220°C in the soaking section and heated for 180 minutes, in which the slab is in the soaking section The heating time is 45 minutes to ensure that the Nb and V micro-alloys precipitated in the slab are fully re-dissolved, the austenite grains are refined and the controlled cooling precipitation after rolling is prepared, the internal structure of the slab is uniform, and the furnace is released;
[0039] B. Use high-pressure water with a pressure of 17MPa to spray and descale the front and back sides of the slab out of the furnace for 13 seconds;
[0040] C. Send the descaled slab to the double-stand compact steckel rolling mill, and control the rolling start temperature to 1100...
Embodiment 2
[0045] A. The slab with the following chemical composition: C 0.070wt%, Si 0.25wt%, Mn 1.45wt%, S 0.005wt%, P 0.018wt%, Nb 0.045wt%, V 0.040wt%, Ti 0.017wt%, N 0.007wt%, Als 0.030wt%, and the rest are Fe and unavoidable impurities, which are sent to a walking beam heating furnace with a temperature of 1230°C in the soaking section and heated for 200 minutes, in which the slab is in the soaking section The time is 50 minutes to ensure that the Nb and V micro-alloys precipitated in the slab are fully re-dissolved, the austenite grains are refined and the controlled cooling precipitation after rolling is prepared, the internal structure of the slab is uniform, and the furnace is released;
[0046] B. Use high-pressure water with a pressure of 15MPa to spray and descale the front and back sides of the slab out of the furnace for 15 seconds;
[0047] C. Send the descaled slab to the double-stand compact steckel rolling mill, and control the rolling start temperature to 1120°C, cond...
Embodiment 3
[0052] A. The slab with the following chemical composition: C 0.069wt%, Si 0.22wt%, Mn 1.46wt%, S 0.005wt%, P 0.016wt%, Nb 0.047wt%, V 0.041wt%, Ti 0.018wt%, N 0.006wt%, Als 0.033wt%, the rest is Fe and unavoidable impurities; it is sent into a walking beam heating furnace with a temperature of 1240°C in the soaking section and heated for 190 minutes. The time is 50 minutes to ensure that the Nb and V micro-alloys precipitated in the slab are fully re-dissolved, the austenite grains are refined and the controlled cooling precipitation after rolling is prepared, the internal structure of the slab is uniform, and the furnace is released;
[0053] B. Use high-pressure water with a pressure of 20MPa to spray and descale the front and back sides of the slab out of the furnace for 10 seconds;
[0054] C. Send the descaled slab to the double-stand compact steckel rolling mill, and control the rolling start temperature to 1130°C, conduct continuous rough rolling for 5 passes, and open...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com