Combined rock fall shed tunnel and installation method thereof
A combination and stone shed technology, applied in the field of sheds and caves, can solve the problems of long construction period, affecting the smooth flow of traffic, and high cost, and achieve the effects of fast installation, good protection effect, and simple structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] In the present invention, except for the pile foundation, other components can be prefabricated components, and all components can be transported to the construction site by machinery or manpower to meet the construction work under harsh road conditions; often in the process of installation, it can be completed in more than ten hours After installation, it has great practical significance in emergency rescue in severe geological disaster areas.
[0022] The invention is a passive protection technology aimed at preventing rockfall disasters with a diameter of less than 2m and a falling height of less than 100m along highways, cities and mine roads under steep and high slopes in mountainous areas.
[0023] The combined rockfall shed of the present invention includes a supporting system and a bearing system.
[0024] The support system includes a pile foundation 1 arranged below the road surface, and a pillar 2 arranged above the pile foundation 1; wherein, the pillar 2 is...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com