Process pipeline divergence lining refractory virtual linear construction method
A construction method and technology for process pipelines, which are applied in pipeline laying and maintenance, pipes/pipe joints/fittings, machinery and equipment, etc., can solve the problem of rework of Sanchakou composite bricks, affecting the quality of pipeline construction and normal production, and construction of closed brick holes. It is difficult to guarantee the quality and other problems, so as to achieve the effect of fast construction progress, high construction efficiency and process saving.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0014] A construction method for lining refractory material masonry at a three-way junction of a process pipeline is completed according to the following steps:
[0015] (1) Hang the line to find the center of the main and branch pipes, determine the exact position of the three-fork composite brick in the main pipe according to the center line of the branch pipe, and then use the center line of the main pipe to position the three-fork in the main pipe on a straight line, repeat After passing the test, build refractory bricks in the lower half ring of all pipelines.
[0016] (2) During the masonry construction of the lower half ring, the brick joints must be controlled within the required size range and the mortar must be full, and the standard roundness should be controlled by the arc-shaped sample ruler, and the roundness of the lower half ring masonry should be guaranteed It cannot be offset from the diameter size and center.
[0017] (3) According to the distribution of th...