Check patentability & draft patents in minutes with Patsnap Eureka AI!

Four-line large-span tunnel cable-arch combined primary support structure

An initial support and tunnel technology, applied in tunnels, tunnel linings, shaft equipment, etc., can solve the problems of unsuitable deformation control, narrow working face, inflexible construction, etc., to improve the safety and flexibility of dismantling bracing and structural safety. The effect of high degree and avoiding the risk of demolition

Inactive Publication Date: 2011-10-26
CHINA RAILWAY ERYUAN ENG GRP CO LTD
View PDF4 Cites 21 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] For the four-line long-span tunnel in soft rock formation, the traditional primary support structure (system bolt + steel frame + sprayed concrete) is adopted. On the one hand, due to the large span and soft rock, the deformation after excavation is not suitable for control
It is characterized by large amount of deformation, fast deformation, long duration, easy cracking of support, and even collapse caused by instability; on the other hand, in order to ensure safety, it is necessary to limit the step length of support removal during construction, and adopt measures such as jumping and demolition , resulting in inflexible construction and narrow working face

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Four-line large-span tunnel cable-arch combined primary support structure
  • Four-line large-span tunnel cable-arch combined primary support structure
  • Four-line large-span tunnel cable-arch combined primary support structure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0015] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0016] refer to figure 1 , the four-line long-span tunnel cable-arch joint primary support structure of the present invention includes shotcrete layers 10 covering the surrounding rock and full-ring steel frames 20 arranged at intervals along the tunnel excavation direction, and anchored to the surrounding walls along the arch wall. The system anchor rod in the rock, the full ring steel frame 20 is embedded in the shotcrete layer 10. The first group of prestressed anchor cables 31 anchored in the surrounding rock and connected with the full-ring steel frame 20 are arranged at intervals along the excavation direction of the tunnel at the junction of the steel frame of the tunnel arch and the temporary vertical brace to replace the temporary vertical brace of the arch; The second group of prestressed anchor cables 32 anchored to the surrounding rock and ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a four-line large-span tunnel cable-arch combined primary support structure, which can effectively control the problems that the arch top of the four-line large-span tunnel settles and the support cracks, ensures the stability and safety of the construction and operation of the tunnel, simultaneously reduces the temporal support in construction, has less procedure interference and rapid construction speed, and is beneficial for the operation of large-scale machinery. The structure comprises a sprayed concrete layer (10) covered on a surrounding rock and whole ring steel frames (20) arranged along a tunnel excavation direction at intervals, and a system anchor bar arched on the surrounding rock along an arch wall face, wherein, the whole ring steel frames (20) are embedded in the sprayed concrete layer (10); a first group of prestressing force anchor cables (31) which are anchored on the surrounding rock, and are connected with the whole ring steel frames (20) are arranged at the connection part of a tunnel arch part steel frame and a temporary vertical support along the tunnel excavation direction at intervals; and a second group of prestressing force anchor cables (32) and a third group of prestressing force anchor cables (33) which are anchored on the surrounding rock and connected with the whole ring steel frames (20) are respectively arranged on the side wall part and close to an arch foot along the tunnel excavation direction.

Description

technical field [0001] The invention relates to an initial support structure of a tunnel, in particular to an initial support structure of a four-line long-span tunnel in soft rock. Background technique [0002] After entering the 21st century, my country's railway construction has developed rapidly, with the rapid and large-scale construction of high-speed railways in mountainous areas. Due to the constraints of many factors such as large curve radius, complex terrain and geological conditions, and high environmental protection requirements, it is extremely difficult to set up station conditions in some sections along the railway. Therefore, in order to improve the freedom of route selection and station establishment for building high-speed railways in difficult and dangerous mountainous areas, make the layout of mountainous stations more flexible, and ensure station functions more easily, more and more super-long-span four-line station tunnels will be built. [0003] The ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21D21/00E21D11/10E21D11/18
Inventor 卿伟宸朱勇杨昌宇高扬陶伟明于茂春唐国荣仇文革李泽龙郑伟郑杰元
Owner CHINA RAILWAY ERYUAN ENG GRP CO LTD
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More