Construction method of fire-retardant coating for benzene hydrogenation engineering steel structure
A fireproof coating and construction method technology, applied in fireproof coatings, anti-corrosion coatings, coatings, etc., can solve problems such as high operating costs, complicated and unreasonable operation processes, and achieve safe and reliable coating engineering quality, simple operation, and design reasonable effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0021] The construction method of benzene hydrogenation engineering steel structure fireproof coating of the present invention is characterized in that comprising the following steps:
[0022] a. Derusting and surface treatment of steel structures. After the steel components are welded and manufactured, use an electric wire wheel grinder to clean up the loose scale, rust, dust, oil and sundries on the surface of the steel components;
[0023] b. Apply the red lead primer, apply the red lead anti-rust primer by roller coating, dry it naturally for 24 hours after painting, and test the paint film thickness with a magnetic thickness gauge, the paint film thickness is 35-45 μm In between, if the thickness is insufficient, paint again; the red lead primer for brushing is phenolic red lead antirust primer, and when the viscosity of phenolic red lead antirust primer is too high, dilute it with industrial xylene, Control within 40-50 seconds, and the amount of fire-resistant coating i...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More