Composite prefilming technique of steam condenser copper tube
A condenser and pre-film technology, applied in the direction of metal material coating process, can solve problems such as poor protection, and achieve the effect of solving limitations, increasing alkali resistance, and expanding adaptability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Such as figure 1 After the condenser copper tube composite pre-film system is connected, first wash, degrease, pickle and activate the condenser copper tube, and then perform pre-film treatment. The specific steps are as follows:
[0029] 1. Cleaning
[0030] 1. Rinse
[0031] Fill the cleaning pre-membrane system with clean water and turn on the pump to circulate, check whether there is any leakage in the system, eliminate the leakage in time, and continue to circulate and rinse until the effluent is clear and then discharge.
[0032] 2. Degreasing and degreasing cleaning
[0033] Inject clean water and oil stain cleaning agent into the cleaning pre-membrane system, turn on the pump to circulate, add clean water when the system water is insufficient, and pass steam into the liquid distribution tank, heat to above 50°C, and discharge the cleaning liquid after 8 hours of circular cleaning ; Then use clean water to flush the system with the pump for 30 minutes, and dra...
Embodiment 2
[0048] Except following difference, other is with embodiment 1.
[0049] 3. Pre-film
[0050] 1. Preparation of pre-film solution and pre-film treatment
[0051] Inject appropriate amount of clean water (tap water or underground water, soft water is not available, soft water buffer capacity is poor, and pH is difficult to control) into the cleaning pre-membrane system, and the pre-membrane agent ferrous sulfate is 300 ~ 400mg / L and the pH regulator Na 2 CO 3 Put 500~700mg / L into the dosing tank and stir evenly; turn on the pump to circulate, and use Na 2 CO 3 Adjust the pH value of the solution and control it to between 5.5 and 6. After the circulation is uniform and stable, pre-film treatment; during the process of circulating pre-film, raise the height of the circulating return pipe so that it is 1.5 to 2 meters away from the page of the circulation tank, and every 30 minutes Monitor Fe once 2+ Ion concentration, when Fe 2+ When the ion concentration is lower than 300...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 