[0019] Embodiment: This embodiment is realized through the following steps:
[0020] 1) Erection of temporary underpinning frame: as figure 1 , 2 As shown, underpinning frames are erected on the inner and outer sides of the existing rail-bearing wall 5 wall pre-opening area 6 of the channel 4 in the station 1. Underpinning frame 11 is made up of the door frame structure of inner and outer sides, and each door frame structure is all made of lintel 3 and the door post 2 that is fixed on its two ends, and door post 2 and lintel 3 are perpendicular to each other. The doorpost 2 and the lintel 3 are respectively provided with connection holes, and the two door frame structures on the inner and outer sides are fixedly connected as a whole by the short crossbeam 7 arranged in the connection holes on the doorpost 2 and the lintel 3 . The bottom surface of the short beam 7 is parallel to the bottom surface of the lintel 3 , and the side surfaces are parallel to the side surfaces of t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 