Numerical-control petroleum workover line
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- 胜利油田胜兴集团有限责任公司
- Publication Date
- 2013-01-16
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention discloses a numerical control operation line for petroleum well workover, which is mainly applicable to the maintenance process of petroleum oil wells. Background technique
[0002] In the maintenance process of existing oil wells, it is usually necessary to lift out and lower the tubing one by one. The existing equipment is usually realized by combining the hook on the derrick with the tubing elevator. The tubing is lifted by manual assistance. , when the tubing is lifted manually, it is unstable and easy to shake, and it is easy to damage the tubing. The downhole part of the tubing is usually fixed with slip teeth. Since the existing jaws only have a short length when they are in action, the force application area is small and it is easy to pinch. Oil pipe, and it is not easy to control the falling speed and direction of falling by the oil pipe’s own gravity during the downward movement, causing radial displacement of the oil pipe, whi...