Timing automatic ash throwing mechanism
An automatic and ash storage technology, applied in wellbore/well components, earth-moving drilling, sealing/isolation, etc., can solve the problems of high construction cost, high safety risk and high safety risk
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] The timing automatic ash throwing mechanism relates to oil, gas, and water well workover technical fields, and is mainly used for oil, gas, and water well workover operations with pressurized ash throwing operations after bridge plugs or plugs are opened, and can also be applied to well workover Regular ash throwing operations in the job.
[0038] Such as figure 1 As shown, this timing automatic ash throwing mechanism includes an ash storage part and an excitation part. The exciter 7 of the excitation part is located below the hollow piston 5 of the ash storage part. When the exciter 7 is in the state to be activated, the hollow piston 5 blocks the ash storage Part of the release port 6, when the exciter 7 is in the activated state, the hollow piston 5 moves to the upper position under the push of the high-pressure gas generated by the exciter 7, the release port 6 of the ash storage part is opened, and the cement placed in the ash storage part The slurry flows out thr...
Embodiment 2
[0041] The ash storage part in the above embodiment is composed of the pressure balance hole 2, the ash storage pipe 3, the release joint 4, the hollow piston 5, and the release port 6. The ash storage pipe 3 and the upper joint 1 are connected by threads, and the ash storage pipe 3 There is a release nipple 4 threaded at the bottom, and a hollow piston 5 is built in the hollow cavity of the release nipple 4, and a release port 6 is opened on the side wall of the release nipple 4, see figure 2 , There is a pressure balance hole 2 at the side wall above the ash storage pipe 3 .
[0042] The pressure balance hole 2 plays the role of balancing the upper and lower pressures of the ash storage pipe 3 after the release port 6 is opened, which is beneficial to the outflow of the cement slurry in the ash storage pipe 3 and completes the replacement of the liquid in the well with the cement slurry.
[0043] The structure of the hollow piston 5 is as image 3 As shown, the hollow pist...
Embodiment 3
[0048] The excitation part in the embodiment 1 is composed of an exciter 7, an excitation device 8, an excitation device base 9, and a short circuit joint 10. The excitation device 8 is fixed with an exciter 7, and the bottom of the excitation device 8 is an excitation device base 9, and the excitation device A short circuit joint 10 is connected under the base 9 , the lowest end of the short circuit joint 10 is a guide shoe 11 , and the exciter 7 is electrically connected to the short circuit joint 10 through the excitation device 8 and the base 9 of the excitation device.
[0049] The trigger 7 is a cylindrical structure, and the copper outer wall of the trigger 7 has threads for connecting with the trigger device 8, and the trigger 7 is equipped with explosives.
[0050] There is a battery compartment and a control circuit in the short circuit joint 10, wherein the control circuit is located at the upper end of the short circuit joint 10, the battery compartment is located a...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 