Terminal test system and method
A terminal testing and testing system technology, applied in transmission systems, transmission monitoring, electrical components, etc., can solve problems affecting the progress of new user terminal consistency interconnection testing, lack of terminal consistency testing equipment, etc., to ensure time synchronization. The effect of requiring and avoiding jitter
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] In the RRM conformance test example of the TD-LTE communication system, the execution process generally follows the following steps: (1) establish two TD-LTE cells, and set the cell environment to meet specific conditions; Broadcast system messages; (2) The terminal under test is turned on and stays in the state 2A or 3A specified in the TS36.508 specification; (4) After a certain period of time, the power of the cell changes, and the reflection of the terminal under test is observed; (5) According to the (6) Repeat the above steps several times until the confidence requirements are met.
[0047] The reselection test case between same-frequency TD-LTE cells in the idle state is used to verify whether the tested terminal meets the reselection delay specified by 3GPP when reselecting in two adjacent same-frequency cells in the idle state. The delay is defined as the time between when the power parameters of each physical channel of the cell are changed and when the termin...
Embodiment 2
[0061] Such as Figure 6 Shown, utilize the test system of the present invention to carry out the method for TD-LTE terminal protocol consistency test, comprise the following steps:
[0062] S100: Initialize the test system, and automatically create a main test component.
[0063] S200: The main test component judges the type of test currently executed, and determines the number of slave test components to be created. Since the terminal protocol conformance test is performed, the main test component creates a slave test component.
[0064] S300: Execute the executable test case set by using the system simulator from the test component to test the terminal under test, specifically including the following sub-steps:
[0065] S321: The terminal under test completes the cell camping by interpreting the system information.
[0066] S322: The terminal under test establishes a connection with the TD-LTE system simulator, including establishment of an access layer connection and a n...
Embodiment 3
[0071] Such as Figure 7 As shown, the method for performing the terminal radio resource management conformance test by using the above test system includes:
[0072] S100: Initialize the test system, and automatically create a main test component.
[0073] S200: The main test component judges the type of test currently executed, and determines the number of slave test components to be created. Since the terminal wireless resource management consistency test is performed, the main test component creates three slave test components: slave test component 1 and slave test component 2 and from the test component three. The test component one is responsible for constructing the TD-LTE executable test set, the test component two is responsible for constructing the TD-SCDMA executable test set, and the test component three is responsible for constructing the GSM executable test set.
[0074] S300: Jointly execute the RRM consistency executable test case set from the test component ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com
