A construction method and slope technology, which are applied in excavation, infrastructure engineering, construction, etc., can solve the problems of not being able to protect and stabilize the slope, unable to achieve the effect of stabilizing the slope, and difficult for the natural succession of plant communities, etc. To achieve the effect of long-term vigorous growth, rapid restoration of vegetation, and rapid construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] Such as figure 1 The shown construction method flow chart of the present invention, the first step, cleans up, leveling the slope surface: adopt artificial removal of slope surface sundries, pumice, and knock off protruding rocks, make the slope surface as smooth as possible; to the neat and smooth rock slope surface Carry out excavation treatment to keep the slope surface rough and easy to bond with sprayed artificial soil. For the cave parts, use block stones or rubble concrete to fill up to the existing slope; the larger concave parts can be filled with artificial soil in plastic woven bags.
[0039] The second step is to install the planting board
[0040] The planting board is mainly used to stabilize the sprayed artificial soil and seedling substrate, so that it can be stably attached to the slope and connected with the slope to prevent it from sliding down. The material composition of the planting board: the planting board is composed of retaining strips, posit...
Embodiment 2
[0062] The difference between embodiment 2 and embodiment 1 is that in the second step of installing the planting board, the retaining bar is 500mm long, 70mm wide, and 10mm thick; the positioning reinforcement adopts a Φ12mm steel bar with a length of 30cm. I want to compare the length and width of the baffles in Example 1, which is easier to stabilize the substrate sprayed on the planting board; the row spacing of the planting board is controlled at 50cm. The positioning steel bar is driven into the slope at a depth of 20cm, and the specific depth is adjusted according to the geological conditions of the slope to ensure the stability of the planting board and the base material after spraying. There should be no overhead phenomenon between the planting board and the slope; the retaining strips of the planting board should be firmly bound with the positioning ribs, without tipping or loosening;
[0063] In addition, in the third step of laying steel wire mesh, the main anchors...
Embodiment 3
[0065]Embodiment 3 is identical with embodiment 1 other steps, and difference is: in the 5th step spray planting seedling-raising matrix, before adding shrub arbor seed and stirring, earlier seeds are soaked, and its soaking time and water temperature are as follows:
[0066] Seed Soaking Treatment
[0067]
[0068] The germination rate of the seeds soaked according to the method in the above table is about 85%. For some of the seeds whose shells are hard, the soaking time is long to soften the shells and make them easy to germinate. For the tender seeds themselves, a shorter soaking time can be used. It also plays a big role in softening the shell. The higher the water temperature, the easier it is to soften the shell.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com