'|'-shaped free surface holing one-step well completion technology
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- 安徽马钢矿业资源集团姑山矿业有限公司
- Publication Date
- 2013-09-18
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention belongs to a one-time well-forming blasting process in metallurgical mines, and is suitable for excavating cutting grooves or constructing vertical shafts in underground pillar-less caving mining processes. Background technique
[0002] At present, there are three main methods of excavating cutting grooves in underground mines that adopt the method of caving without pillars: ① combined trenching method of cutting level roadway and cutting patio; ② trenching method of cutting patio; Among them, the first two methods need to excavate the cutting patio at the end of the mining roadway. At present, the construction of the cutting patio is completed by manual excavation or bottom-up blasting in stages, which has high labor intensity, poor safety conditions, long construction time and poor operating conditions. hard. The disadvantage of the third method is that there are many blast holes, high production cost, and high labor intensity, and bec...