Water, fire and light combined optimization power generation scheduling optimization method considering security constraints

A technology for power generation planning and safety constraints, applied in photovoltaic power generation, computing, and single-grid parallel feeding arrangement, etc., can solve the problem of insufficient photovoltaic power acceptance capacity, unreasonable power supply layout, inability to meet grid frequency voltage and power supply reliability requirements, etc. question

CN103414206AInactive Publication Date: 2013-11-27NARI TECH CO LTD
4 Cites 26 Cited by

Patent Information

Authority / Receiving Office
CN · China
Current Assignee / Owner
Publication Date
2013-11-27
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention belongs to the technical field of electric power system dispatching automation and relates to a water, fire and light combined optimization power generation scheduling optimization method considering security constraints. According to the water, fire and light combined optimization power generation scheduling optimization method, the objective of the method is to realize minimum power generation cost of a system; comprehensive considerations are given to coordinated scheduling of hydroelectric, thermal power and photovoltaic power generator sets; all kinds of constraint conditions are considered, such that optimal computation is performed power generation scheduling of the generator sets; safe access of new energy such as photovoltaic power generation power can be ensured; the improvement of intelligent level and decision making ability of power generation scheduling after the access of the new energy can be facilitated; and through interactive iteration solution of two sub-problems of optimization calculation and safety correction, the power generation scheduling of the hydroelectric, thermal power and photovoltaic power generator sets, which satisfy a requirement for network safety, can be obtained, and therefore, the performability of the power generation scheduling can be ensured. The water, fire and light combined optimization power generation scheduling optimization method considering security constraints of the invention is advantageous in low calculation strength and strong adaptability, and is more suitable for being popularized and applied to scheduling mechanisms of which photovoltaic power generation power access power is larger in China.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention belongs to the technical field of electric power system scheduling automation, and in particular relates to an optimization method for joint optimization of hydropower, photovoltaic power generation and thermal power generation plan considering safety constraints. Background technique

[0002] At present, energy saving, emission reduction and curbing climate warming have become a common challenge and an important issue facing the whole world. The Chinese government attaches great importance to the work of energy conservation and emission reduction in the power industry, and proposes to implement energy-saving power generation dispatching in the power field, improve the efficiency of energy use in the power industry, reduce environmental pollution, and promote the adjustment of energy and power structures. This is a major measure for the electric power industry to implement the scientific outlook on development and build a harmonious socia...

Examples

Embodiment Construction

[0042] In order to make the technical means, creative features, goals and effects achieved by the present invention easy to understand, the present invention will be further described below in conjunction with specific embodiments.

[0043] The present invention considers the optimization method of water-light-fire joint optimization power generation plan considering safety constraints. The following is a preferred implementation case of the present invention, including the use of the method of the present invention, considering the establishment process of the hydroelectric thermal power and photovoltaic power generation unit joint optimization power generation plan of safety constraints, its characteristics, purposes and advantages can be understood from the description of the embodiment see.

[0044] In the process of grid day-ahead power generation planning, it is necessary to combine the next day’s photovoltaic power forecast and the available status of each conventional ...