Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

106results about How to "Keep the economy running" patented technology

Double-inlet double-outlet steel ball coal mill straight blowing type milling system optimized control method

The invention discloses an optimum dual-inlet and dual-outlet steel ball coal grinding machine direct-blow type powder-preparation control method. The method obtains the material position of the coal grinding machine after carrying out soft-measurement processing by collecting the noise material position of the coal grinding machine, the material position of pressure difference, the current of the coal grinding machine, one-time air quantity, one-time opening of the hot wind door and the cold wind door of an inlet, inlet temperature and outlet temperature; the control comprises material position control, air quantity capacity control, bypass air quantity control and the temperature control of the inlet and the outlet; the material position is optimized and the best material position of the coal grinding machine is searched online so as to ensure the combustion safety of the boiler and coal powder supply quantity when the load of the boiler is adjusted. The boiler combustion is optimized: according to the boiler technology, the load and the running working conditions, the powder supply quantity and the ventilation quantity of each coal grinding machine are optimized and the combustion efficiency of the boiler is improved. Malfunction diagnosis, running evaluation and analysis are carried out to the system and reasonable suggestions are provided so as to ensure the system to run continuously, stably, safely and economically; the optimum dual-inlet and dual-outlet steel ball coal grinding machine direct-blow type powder-preparation control method is widely applied to the dual-inlet and dual-outlet steel ball coal grinding machine direct-blow type powder-preparation system or industrial similar systems in other industries.
Owner:西安蓝海机械仪表成套有限责任公司

Distribution network fault judgment searching and positioning system

The invention provides a distribution network fault judgment searching and positioning system which belongs to the technical field of power engineering. A data acquisition device of the system is used for acquiring the state information of a distribution network, and transmitting the state information of the distribution network to a main station database server through a dedicated power communication network. GIS is used for storing and updating geographic information. PMIS is used for storing and updating the parameter information of a transformer and a transmission line. A fault judgment system server is used for providing the functions of fault information retrieval, fault diagnosis, data management analysis, graph processing and information dissemination. According to the invention, distribution network power cut and transmission information query retrieval, failed equipment searching and positioning and online graph display can be carried out; when the distribution network is failed, the system can help emergency repair staff to carry out quick fault point positioning and fault judgment; outage time is effectively shortened; outage range is prevented from expanding; valuable repair time is saved; and the system is fast, flexible and accurate.
Owner:TIANSHUI POWER SUPPLY COMPANY OF STATE GRID GANSUELECTRIC POWER

Large circulating fluidized bed unit cooperative control device based on intensified combustion

The invention relates to a large circulating fluidized bed unit cooperative control device based on intensified combustion, comprising a load control center loop, a steamer main control loop and a boiler main control loop. A novel limiting scheme is adopted for load instruction change rate, wherein the limitation of a load change rate is smoothly and gradually increased according to a degree exceeding a normal range of bed temperature and main vapor pressure by adopting a load coordination fuzzy control loop; a fuzzy feedforward controller and a fuzzy self-regulating PID (Proportion Integration Differentiation) controller are combined in a boiler main control loop to jointly control an electricity generating load and a heat load of a unit, and by combining a control rule of a feedforward control module with the experience of operating personnel and experts, a fuzzy control rule is formed according to the control quantity of boiler main control and steam turbine main control corresponding to different loads in operation; in the steam turbine main control, the fuzzy feedforward controller of the load instruction is additionally arranged and is combined with the fuzzy self-regulating PID controller to jointly control the electricity generating load; and in the boiler main control, the intensified combustion fuzzy feedforward controller is additionally arranged.
Owner:ELECTRIC POWER RES INST OF GUANGDONG POWER GRID

Optimization control method for grind grading process

The invention discloses an optimal control method for grinding and grading mineral powder, which is characterized in that: the grinding load and grinding concentration is obtained by sampling grinding-grading process signal, with the help of the advanced control and through testing the state in the grinder; the optimal grinding load, the optimal sand-returning ratio, the optimal grinding concentration and the optimal overflow concentration are obtained through the grinding load optimization, the sand-returning ratio optimization, the grinding concentration optimization and the overflow concentration optimization; the feeding quantity is obtained through the control algorithm of the feeding quantity ; the sand-returning water volume is obtained through the control algorithm of the sand-returning water volume; the discharging water volume is obtained through the control algorithm of the discharging water volume. The optimal control method has advantages that: the global optimization to the grinding-grading process is realized; and meanwhile the diagnosis is done to reveal the fault of the grinding-grading process; the appraisal and analysis is executed in the grinding-grading process; reasonable advice is come out; continuous, stable, safe and economic running is ensured; so the method is widely used in the grinding-grading process and similar wet milling process in other industry crafts.
Owner:徐宝平

Standby and peak shaving auxiliary service cost allocation method facilitating new energy grid-connected consumption

The invention provides a standby and peak shaving auxiliary service cost allocation method facilitating new energy grid-connected consumption. The method comprises the steps that a target function and constraint conditions of a new energy grid-connected consumption model based on production simulation are determined; the standby auxiliary service cost spent after new energy grid connection is calculated; new energy wind turbine generator earnings are calculated; the standby auxiliary service allocated cost is calculated; the peak shaving auxiliary service allocated cost spent by wind power connection is calculated. According to the standby and peak shaving auxiliary service cost allocation method facilitating new energy grid-connected consumption, the consumption model taking the extra service cost spent by new energy grid connection into account is built, the standby and peak shaving auxiliary service cost spent by new energy in different situations is analyzed, and therefore the allocation scheme for the auxiliary service cost spent after new energy grid connection is provided; service providing initiative of a traditional power source is effectively improved, the benefits of a provider are ensured, wind or light abandoning is reduced, and economical operation of a system is ensured.
Owner:STATE GRID CORP OF CHINA +2

Optimization method of day-ahead unit commitment of thermal power system of thermal power plant capable of operating under multiple states

The invention discloses an optimization method of the day-ahead unit commitment of a thermal power system of a thermal power plant capable of operating under multiple states. The optimization method comprises the following steps: firstly, predicting the total power generation load of the system and the heat supply load of each thermal power plant on the next day; then, taking the minimum total power generation coal consumption of thermal power system on the next day as a target, and taking a situation that power supply and thermal energy supply are satisfied as a condition to establish an optimization model of the thermal power system unit commitment by simultaneously meeting constraints including the reserve requirements of the thermal power system, the electrothermal coupling characteristics of an extraction steam turbine of the thermal power plant and the thermal characteristics of a thermal storage tank; and finally, using an optimization algorithm to calculate to obtain a startup-shutdown plan of each thermal power unit, a power generation and steam extraction plan of a steam turbine of a heat supply unit and a thermal charging and discharging plan of the thermal storage tank in the thermal power plant on the next day so as to guarantee the economic operation of the thermal power system.
Owner:STATE GRID HENAN ELECTRIC POWER ELECTRIC POWER SCI RES INST +2

Hybrid drive waste heat utilization double-heat-pump system and control method

The invention provides a hybrid drive waste heat utilization double-heat-pump system and a control method. The system comprises a hybrid drive gas heat pump system, a waste heat recycling water circulating system and an absorption type heat pump system. The hybrid power drive gas heat pump system comprises a gas engine, a motor, a stepless speed change device, a power coupling, an inverter, a lithium iron phosphate battery pack, a compressor, a four-way valve, the compressor and engagement and disengagement devices. By the adoption of the gas engine, in cooperation with the motor, after the power coupling stepless speed change, the compressor is driven to work, and the refrigeration/heating circulation of the heat pump system is achieved. After being recycled, low-grade high-temperature waste heat of an engine cylinder sleeve and exhaust is used as a power input source of the absorption type heat pump generator end, and separated supply of hot water and low-temperature water is achieved. By the adoption of the hybrid drive waste heat utilization double-heat-pump system and the control method, it can be guaranteed that the engine operates economically under different loads and the waste heat of the gas heat pump system is fully utilized, and the problem of the low waste heat utilization rate in summer is solved.
Owner:SOUTHEAST UNIV

Wind power prediction method based on adaptive linear logic network

ActiveCN102411729AEasy to analyze mathematicallyThe result is stable and controllableClimate change adaptationSystems intergating technologiesElectricityPower station
The invention, which belongs to the renewable-energy generated power prediction technology field, discloses a wind power prediction method based on an adaptive linear logic network. In the method, historical data of a wind power station is used to carry out adaptive training to the linear logic network, wherein the historical data comprises: historical output of a wind turbine and the historical meteorological data. In a real time usage process, the system carries out prediction to the generated power of the wind power station through collecting value meteorology forecast data, actual measured wind data and real time power generation power data. By using the method of the invention, a prediction wind power modeling process is simple. The process is easy for mathematical analysis. A prediction result is stable and reliable. A training speed is fast. On-line repetition training is supported and a requirement to an operational processor is low. The system can provide a basis for power grid to schedule and compile a wind power station power generation plan curve. When the wind power accesses to the electric power system, an electric power value in an electric power market can be optimized and simultaneously, a beneficial reference can be provided for operation and maintenance of the wind power station.
Owner:GUODIAN NANJING AUTOMATION

Power generation cost optimization method for iron and steel enterprise

The invention provides a power generation cost optimization method for an iron and steel enterprise, and belongs to the technical field of comprehensive power saving in iron and steel enterprises. The power generation cost optimization method comprises the following steps: a dispatching cycle T which needs power generation cost optimization is determined, and power generation cost optimization parameters of a set are acquired; a network cross section used for planning a current power generation schedule is acquired; fuel cost of the generator set under the condition of coal gas blending combustion in the cycle is determined; according to the energy consumption of the set of the iron and steel enterprise, external electricity purchasing cost and an external power transmission income physical truth, an optimized dispatching model which aims for the lowest power generation cost of a whole system is established; results of self-generating set output, externally purchased electricity, externally transmitted electric quantity and the like of the iron and steel enterprise are obtained according to an optimization solution. The power generation cost optimization method for the iron and steel enterprise has the advantages of being capable of meeting requirements for production loads, generator set output, line transmission capacity and the like, guaranteeing safe and reliable operation of a grid of the iron and steel enterprise, further optimizing and adjusting self-generating electricity output and a proportional relation between self-generated electricity and externally purchased electricity in combination with a load prediction curve and a production and repair schedule, and enabling the generation cost of the iron and steel enterprise to be the lowest.
Owner:AUTOMATION RES & DESIGN INST OF METALLURGICAL IND

Photovoltaic micro-grid interval optimization scheduling method with multi-time scales

The invention discloses a photovoltaic micro-grid interval optimization scheduling method with multi-time scales, and belongs to the field of renewable energy source micro-grid techniques. The photovoltaic micro-grid interval optimization scheduling method comprises the following steps: by using an interval value description method, describing the intermittency of renewable energy and inaccuracy characteristics of load prediction; meanwhile, by adopting a dual-layer optimization strategy, providing active power instructions for operation of different micro-grid components within 24 hours of a former day and in real time (every 15 minutes); and because of a relatively large amount of indefinite factors in the operation process of a micro-grid and a limited rotation reserve capacity available inside a system, generally confirming positive and negative rotation reserve capacities purchased from a power distribution grid by the micro-grid according to a current scheduling plan, and coordinating operation of different components of the micro-grid. The photovoltaic micro-grid interval optimization scheduling method is capable of solving the problems that the current scheduling is deviated from actual operation situations and the like because of unbalanced micro-grid power, and has the advantages that real-time scheduling can be implemented to comply with the current rotation reserve plans, the plans can be adjusted according to real-time error situations, intermittent energy fluctuation can be balanced, and economic operation of the system can be ensured.
Owner:ANHUI UNIVERSITY OF TECHNOLOGY AND SCIENCE

Neutral chemical cleaning agent for eliminating hard scales of air pre-heater of desulfurization system and preparation method of neutral chemical cleaning agent

The invention discloses a neutral chemical cleaning agent for eliminating hard scales of an air pre-heater of a desulfurization system and a preparation method of the neutral chemical cleaning agent. The neutral chemical cleaning agent is compounded of a main cleaning agent, a surfactant, a penetrant, caustic soda liquid and water. The cleaning agent has complexing action with aluminum metasilicate and silicate scales on the surface (in contact with the cleaning agent) of the air pre-heater to achieve the purpose of dissolving dirt; by virtue of permeation and swelling, cracks and gaps are generated in an inner structure of a scale layer. The cleaning agent adopts a safe and environmental-friendly neutral scheme and is free of toxicity. The main compound, namely the main cleaning agent, is easily biodegraded so that the environmental problems are avoided; the cleaning agent has the characteristics of quickly removing scales and not corrode a steel frame, not damaging an enameled heat exchange component, not damaging the flak anticorrosive material and the like. When used for cleaning the air pre-heater, the neutral chemical cleaning agent has the beneficial effects that the removal rate of hard scales is 98% or above, and the light transmittance of the air pre-heater reaches 95% or above, and moreover, the heat exchange efficiency of the heat exchange equipment is improved, a vent channel is dredged, and safe and economical operation of the unit is guaranteed.
Owner:SHANGHAI WEILAI ENTERPRISE

Method for calibrating on-line chromatographic monitoring device of transformer station without shutdown

The invention relates to a method for calibrating an on-line chromatographic monitoring device of a transformer station without shutdown. The method comprises the following steps: allowing an oil outlet and an oil return opening of a chromatographic calibrating apparatus to be communicated with an oil inlet pipe and an oil outlet pipe of the on-line monitoring device respectively so as to form a basic loop of an on-line monitoring device calibration system; preparing a standard oil sample for calibration in the chromatographic calibrating apparatus; opening the basic loop of the on-line monitoring device calibration system through a control valve and starting the on-line monitoring device for detection of the concentration of gas dissolved in the standard oil sample prepared in the chromatographic calibrating apparatus; introducing carrier gas into a chromatographic instrument for 10 min; starting the chromatographic instrument, weighing a certain amount of the standard oil sample from the chromatographic calibrating apparatus after the base line of the chromatographic instrument becomes stable, and detecting the standard oil sample by using the chromatographic instrument; and respectively recording the detection data of the on-line monitoring device and the chromatographic instrument, and on the basis of the detection data of the chromatographic instrument, analyzing whether the relative measurement errors and repeatability of the on-line monitoring device meets requirements.
Owner:STATE GRID HEBEI ELECTRIC POWER RES INST +2

Active coordination and control method for new energy combined power generation system containing energy storage system

The invention discloses an active coordination and control method for a new energy combined power generation system containing an energy storage system. The method comprises the steps of (1) acquiring real-time data from a supervisory control and data acquisition (SCADA) system and updating the information of an AGC model; (2) calculating the control goal of a combined power generation system in the currently control scenario according to the control scenario in which the combined power generation system currently participates the AGC process; (3) calculating the currently maximum admissible new energy generating margin of an energy storage system; (4) according to the ultra-short-term power predicted value of the new energy and the currently maximum admissible new energy generating margin of the energy storage system, decomposing the overall control goal of the combined power generation system that is obtained through the calculation process during the step (2), and respectively calculating the control goal of a new energy generating system and the control goal of the energy storage system; (5) verifying and checking instructions for each control object obtained through the calculation process during the step (4), and issuing final control instructions after ensuring the instructions are error-free. According to the technical scheme of the invention, the energy storage system is effectively utilized to quickly absorb and release the electric energy, so that the control object can be quickly and accurately tracked.
Owner:NARI TECH CO LTD +1

Self-adaptation excitation control method for synchronous generator

A self-adaptation excitation control method for a synchronous generator is characterized by including: preliminarily determining a stability domain of each control parameter according to the principle of satiability; combining MAGA (multi-agent genetic algorithm), CMAC (cerebellar model articulation controller) and a PID (proportional-integral-derivative) controller, and using global optimization capability of MAGA for optimization in determined stability domains of control parameters Kp, Ki, Kd, eta and alpha; obtaining the optimal control parameter combination according to certain control objective function minimum principles so as to realize synchronous generator self-adaptation excitation control. By using distributed control of a one-dimensional multi-agent control system, the control parameters can be harmonized and optimized, the problem that intelligent multi-parameter coupling and multiple control parameters are difficult to determine is solved, synchronous generator self-adaptation excitation control is achieved, operation and analysis of a control system are accelerated, and the synchronous generator can be operated economically while safe, stable, economical and reliable operation of a power grid is guaranteed.
Owner:NANCHANG HANGKONG UNIVERSITY

All-welded plate shell type stainless steel condenser and application thereof

ActiveCN102425958AOvercoming Heat Transfer Performance DeteriorationReduce cooling areaSteam/vapor condensersSteam engine plantsPower stationEngineering
The invention provides an all-welded plate shell type stainless steel condenser and application thereof. The all-welded plate shell type stainless steel condenser is a key device in a thermodynamic system of a power plant. Concave-convex multi-point type stainless steel sheets are adopted in a high-vacuum negative-pressure rectangular case at a dead steam part; two sheets are provided with longitudinal welding lines between which tops of convex grooves are opposite to each other, so as to form a dead steam path which is of single flow path type; the other two sheets are provided with transverse welding lines, between which bottoms of concave grooves are opposite to each other, so as to form a circulation cooling water path which is separated into two equal flow paths by a case separator; the height of the convex grooves is equal to the depth of the concave grooves and is not less than 6mm; small convex grooves are arranged among convex grooves and small concave grooves are arranged among concave grooves. The dead steam exchanges heat with the circulation cooling water in a fair flow / cross flow manner from top to bottom by virtue of flow paths at two sides of the sheets, and is condensed into water and flows downwards in a mode of beads, and water gathered in a steam gathering chamber and a water gathering chamber flows out through a heat well condensed water outlet. The condenser has the advantages of compact structure, material saving, light weight, low production cost, short investment return period and is worthy of popularization and application in large scale.
Owner:北京市京海换热设备制造有限责任公司

Comprehensive utilization method of ionic membrane electrolytic saline solution waste liquid

The invention relates to a comprehensive utilization method of an ionic membrane electrolytic saline solution waste liquid, which comprises the step of sending dechlorinated dilute brine coming out of an electrolytic tank to a membrane process denitration device for denitration. The comprehensive utilization method is characterized by comprising the following steps of: pre-adjusting the pH value of a system to 3-8 by using a saline solution pH value automatic control device, exchanging the heat till the temperature of the system is 25-50 DEG C, removing free chlorine till the content of chlorine is less than or equal to 3 ppm, sending into a primary membrane separation system for primary membrane separation and controlling the primary membrane separation pressure to be not higher than 3.0MPa; and then sending into a secondary membrane separation system for secondary membrane separation, controlling the secondary membrane separation pressure to be not higher than 3.5 MPa, separating to obtain desulfurized brine and concentrated nitrate water, sending the dissolved desulfurized brine to an ionic membrane electrolytic saline solution device for reutilization and sending the concentrated nitrate water to a thermal method denitration device to prepare thenardite. The invention has the beneficial effects that as the two stages of membrane separation systems are adopted, the pressure is more stable, the membrane service life is long, and the separation effect is good; the content of sodium sulfate in the separated concentrated nitrate water can reach above 90 g / l, and the content of sodium sulfate in the desulfurized brine can reach below 3 g / l.
Owner:CHINA PETROLEUM & CHEM CORP +1

Power supply network path planning system of distribution unit area

The invention relates to a power supply network path planning system of a distribution unit area. The power supply network path planning system comprises a main station system; the main station system is connected with a plurality of field data collection terminals; and each field data collection terminal is further connected with a voltage acquisition meter and a current acquisition meter respectively. The power supply network path planning system of the distribution unit area, provided by the invention, adopts an information and power grid control technology; all the voltage acquisition meters and current acquisition meters in the distribution unit area continuously acquire data according to a layered and partitioned total idea and report the data to the field data collection terminals; then the data is reported to the main station system through the terminals; power distribution of a main line and each branch line in power distribution and power utilization processes of the distribution unit area and power loss of a network are automatically optimized through power distribution line data which is recorded by the main station system in advance, so that the optimization of a power supply network is realized and the line is lowered; economical operation of a power grid of the distribution unit area is guaranteed, energy saving and loss reduction are realized and the problem of eliminating low voltage is realized; and the voltage regulation and control capability of the power grid is improved and the power supply quality is improved.
Owner:GUANGZHOU DIKO ELECTRONICS TECH

Internal steam conduction apparatus of direct air cooling branch-shaped exhaustion duct system

The invention discloses a flow guide device in a direct air cooling branch-shaped exhaust duct system, which is applied in the field of heat energy power engineering. The device solves the problem of even flow distribution of steam exhaust of a steam turbine among various steam distribution pipes. The device prevents the danger of the freezing of a direct air cooled condenser which is possibly caused by the unreasonable design of the direct air cooling branch-shaped exhaust duct system, and ensures safe operation of the steam turbine in winter. The device ensures that a system prevents the pressure loss of water vapor from being overhigh and the supercooling area from being overlarge, prevents the reduction of heat exchange amount, and reduces the thermal efficiency of power plants when realizing the even distribution of the flow of water vapor. The device fully plays the cooling capacity of various parts of the direct air cooled condenser, and ensures that the steam turbine runs economically in other seasons. For realizing the even distribution of the flow of the water vapor, the distribution of the area of a diversion cross-section depends on the resistances of two branch pipe sections, and a branch pipe with a high resistance should obtain larger diversion area. The device is mainly used for steam diversion and cooling systems of power stations, petrochemical industry, and the like.
Owner:BEIJING JIAOTONG UNIV

Microgrid multi-objective real-time rolling optimization method

PendingCN106650998AKeep the economy runningMeet the requirements of economic indicatorsForecastingEnergy storageMicrogridEngineering
The invention discloses a microgrid multi-objective real-time rolling optimization method. According to the method, day-ahead economic optimization result considering three-phase imbalance is taken as a guide, decision making is performed on energy storage output of a microgrid within a short time by applying a super-short-term photovoltaic and power prediction result, connecting line power and an energy storage SOC (State of Charge) value are kept to follow the day-ahead economic optimization result as far as possible, and economic operations of a microgrid system are ensured. The microgrid multi-objective real-time rolling optimization method can meet economic index requirements and effectively follow a result of a day-ahead economic optimization algorithm. Damages are imposed on a power distribution system and electrical equipment by a problem of three-phase imbalance occurred in a single-three phase series-parallel system, and an error exists between a day-ahead predicted value and an actual value in practical application of an economic optimization strategy, so that three-phase imbalance degree constraints are considered, the connecting line power decided by day-ahead optimization is taken as a reference value under the condition of microgrid multi-objective real-time rolling optimization, a real-time energy storage power value is acquired through a non-dominated sorting multi-objective algorithm, and microgrid real-time rolling optimization can be realized.
Owner:SOUTH CHINA UNIV OF TECH

Short-circuit current suppression method considering unit start-stop and line switching

The invention discloses a short-circuit current suppression method considering unit start-stop and line switching, which comprises the following steps that firstly, a relational expression of an admittance matrix and short-circuit current is deduced by utilizing a relation between the node admittance matrix and a node impedance matrix and physical significance of node self-impedance; further the change of ground capacitance after the line is cut off and the influence of the switching line and the start-stop unit on the admittance matrix are considered to obtain a short-circuit current explicit expression; from the perspective of global optimization of the power grid, the influence of economy and current limiting measures on the aspects of system power flow, unit output and the like is comprehensively considered, and a mixed integer linear programming method considering explicit short-circuit current constraint is provided by taking the minimum power generation cost, unit start-stop cost and line switching cost as targets; and meanwhile, a day-ahead scheduling problem of a power system is combined, unit output arrangement and line switching are comprehensively optimized by considering short-circuit current constraints, and an optimal unit start-stop and line switching comprehensive scheduling operation scheme is given on the premise of ensuring economic operation.
Owner:SICHUAN UNIV

Multi-energy complementary system day-ahead optimal scheduling method considering maximum new energy consumption

The invention discloses a multi-energy complementary system day-ahead optimal scheduling method considering maximum new energy consumption. According to the method, aiming at a multi-energy complementary system day-ahead scheduling optimization problem considering new energy consumption, a multi-energy complementary system day-ahead scheduling optimization model is established by taking maximum wind power and photovoltaic power consumption as an objective and solved. The method comprises the specific steps of acquiring output prediction information and electric and thermal load day-ahead prediction information of wind, photovoltaic and other power generation equipment in a day-ahead system; establishing a multi-energy complementary system day-ahead optimal scheduling model considering maximum new energy consumption; and solving the model by using a differential evolution algorithm to obtain day-ahead output plans of various power supplies. According to the multi-energy complementary system day-ahead optimization scheduling method considering maximum new energy consumption, the operation characteristics of various power supplies are comprehensively considered, a day-ahead optimal scheduling plan with the maximum wind power and photovoltaic power consumption as the objective is made, and the consumption level of new energy is improved.
Owner:NORTH CHINA ELECTRIC POWER UNIV (BAODING) +2

Receiving-end power grid flywheel energy storage frequency modulation method and system based on frequency disturbance complementation

The invention provides a receiving-end power grid flywheel energy storage frequency modulation method and system based on frequency disturbance complementation and belongs to the technical field of receiving-end power grid energy storage frequency modulation control. The method comprises the following steps that: when it is judged that the remaining electric quantity SOCFES of a flywheel energy storage device is smaller than 100%, the required charging capacity HFES-C of the flywheel energy storage device is calculated in real time on the basis of the rated capacity HFES-N of the flywheel energy storage device; according to the frequency fluctuation of a receiving-end power grid, an integral electric quantity HPFC needing to be changed of a unit is calculated in real time; and flywheel energy storage frequency modulation control is performed according to the frequency disturbance condition of the receiving-end power grid, the required charging capacity HFES-C and the integral electricquantity HPFC needing to be changed. According to the method and system of the invention, different frequency modulation control modes are adopted for the flywheel energy storage device and the unit according to different power grid frequency disturbances; the actions of the unit at high frequency are reduced, the service life of equipment such as a unit valve is prolonged; rapid primary frequencymodulation can be achieved through the flywheel energy storage device, flywheel energy storage and economic operation of the comprehensive frequency modulation system of the unit are ensured, and flywheel energy storage and stable operation of the comprehensive frequency modulation system of the unit are achieved.
Owner:ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER COMPANY +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products