A construction method and technology for water supply and drainage, which are applied in building thermal insulation materials, thermal insulation, construction, etc., can solve the problems of poor waterproof and thermal insulation effect, low construction efficiency, irregular construction operation, etc., and achieve good waterproof and anti-corrosion effect and good construction effect. , The construction quality is easy to ensure the effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0061] like figure 1 A waterproof and thermal insulation construction method for building water supply and drainage and heating engineering shown, comprising the following steps:
[0062] Step 1. Installation of building water supply and drainage and heating engineering pipelines and sanitary appliances: install the pipelines that need to be installed in the building under construction respectively. The pipelines to be installed are water supply and drainage pipelines or heating pipelines. The installed sanitary fixtures are connected.
[0063] While installing the pipes to be installed, the sanitary appliances also need to be installed. The sanitary appliance is fixedly installed on the floor 3 through anchor bolts 7-1, and the floor 3 is a cast-in-place concrete floor, and the bottom of the anchor bolts 7-1 is pre-buried in the cast-in-place concrete floor. After the construction of the cast-in-place concrete floor slab is completed, the anchor bolts 7-1 need to be waterpr...
Embodiment 2
[0125] In this embodiment, the difference from Embodiment 1 is that the first thermal insulation layer 5-1 described in step 201 is an thermal insulation layer formed by bonding and fixing on the outer side of the pipe joint 1-1 through the floor and formed by bending a rubber-plastic thermal insulation board. The sleeve, the second insulation layer 5-2 is an insulation sleeve that is fixed on the outside of the wall pipe joint 1-2 by bonding and is formed by bending a rubber-plastic insulation board. For details, see Figure 9 .
[0126] In this embodiment, the rest of the structure, connection relationship and construction method steps are the same as those in Embodiment 1.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com