A technology of through-wall casing and through-wall pipe, applied in the direction of pipes, pipes/pipe joints/pipes, mechanical equipment, etc., can solve the problems of air-conditioning scrap, blocking capillary evaporation tubes, and damaged wrapping, etc., and achieves high practicability, Reduce the effect of plugging processes and materials
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0043] Example 1: if figure 1 , figure 2 , image 3 , Figure 4 As shown, a disclosed dust-proof wall-piercing sleeve includes a sleeve, a spacer, and a wall-piercing pipe 5, and is characterized in that:
[0044] The casing includes a left casing 1 and a right casing 2;
[0045] The left casing 1 includes a left connecting pipe 6 and a left decorative ring 8, and the left connecting pipe 6 is connected with the left decorative ring 8;
[0046] The right casing 2 includes a right connecting pipe 7 and a right decorative ring 9, and the right connecting pipe 7 is connected with the right decorative ring 9;
[0047] The spacer includes a left spacer 3 and a right spacer 4;
[0048] There is a left spacer membrane 10 in the left spacer 3;
[0049] There is a right spacer membrane 11 in the right spacer 4;
[0050] The center of the left spacer film 10 and the right spacer film 11 has a cut line 13;
[0051] The kerf line 13 is more than two crossed sharp-edged slits that...
example 2
[0055] Example 2: if figure 1 , figure 2 , image 3 , Figure 4 As shown, a disclosed dust-proof wall bushing has the same structural features as Example 1. When the dust-proof wall bushing is pre-embedded in the masonry wall 14, the dust-proof wall bushing The parts of the pipe are assembled in order, and then the dust-proof wall-through sleeve is placed in the reserved hole position, and the gap between the dust-proof wall-through sleeve and the brick is filled with mortar, and the mortar and thorns 12 are bonded to make the wall-through Pipe 5 is fixed, and when steam pipeline is installed, steam pipeline directly passes through dustproof wall bushing, and after the spacer film in the spacer ring is broken, the pipeline can pass through without sand and dust.
example 3
[0056] Example 3, such as figure 1 , figure 2 , image 3 , Figure 4 , Figure 5 As shown, a preferred dust-proof wall-piercing sleeve is disclosed, which is characterized in that: the spines 12 distributed on the outer circle of the wall-piercing pipe 5 are replaced by spiral ribs 15, and other structural features are the same as in Example 1 Same, when the described dust-proof wall-penetrating bushing is used in the existing wall body 14, first drill holes on the wall body 14, then put the left spacer ring 3 in the left connecting pipe 6 of the left bushing pipe 1, and put the right sleeve Put the right spacer 4 in the right connecting pipe 7 of the pipe 2, then connect the left connecting pipe 6 and the left side of the wall-piercing pipe 5, and then insert the connected assembly into the hole in the wall 14 to clear the wall-piercing pipe 5 After the dust is collected, the right connecting pipe 7 is connected to the right side of the wall pipe 5. When the wall pipe 5 ...