Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Field arrangement management base station and method of wired telemetry seismograph

A seismograph and field technology, which is applied in the field of field arrangement and management of base stations, can solve problems such as insufficient launch, real-time complex calculation processing, etc., and achieve the effect of reducing the burden and reducing the burden of data processing

Active Publication Date: 2014-02-19
BGP OF CHINA NAT GASOLINEEUM CORP
View PDF7 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The number of receiving channels in the field has expanded from the current thousands to tens of thousands, hundreds of thousands, and millions of channels in the future, and the data volume of a single shot has also increased from the current tens of megabytes to hundreds of megabytes, gigabytes, The development of 10-gigabit bytes has made it impossible to break through the bottleneck of expanding the channel capacity of the acquisition system simply by improving the hardware performance and data processing capabilities of the central recording unit. This is mainly due to the overall development of electronic manufacturing technology at the current stage. The level is not enough to launch a small computer system that can perform real-time complex calculation processing on such a large amount of data and is easy to move in the field

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Field arrangement management base station and method of wired telemetry seismograph
  • Field arrangement management base station and method of wired telemetry seismograph
  • Field arrangement management base station and method of wired telemetry seismograph

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0034] Embodiment 1: as figure 1 , figure 2 , image 3 As shown, a field arrangement management base station of a wired telemetry seismograph,

[0035] Such as figure 1 As shown, the seismic instrument host system 99 is respectively connected to the third field array management base station 903 and the fourth field array management base station 904 through the second optical cable 82 and the third optical cable 83,

[0036] The leftward arrow between the seismic instrument host system 99 and the third field arrangement management base station 903 indicates the transmission of control signals, reference scanning signals, etc., and the rightward arrow indicates the transmission of SEGD data, quality control analysis data, etc.

[0037] The rightward arrow between the seismic instrument host system 99 and the fourth field arrangement management base station 904 indicates the transmission of SEGD data, quality control analysis data, etc., and the leftward arrow indicates the t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a field arrangement management base station and method of a wired telemetry seismograph, and belongs to the technical field of seismic data acquisition of exploration and development of the petroleum resource, the natural gas resource and the coal resource. A seismograph mainframe system is connected with a third field arrangement management base station through a second cable and connected with a fourth field arrangement management base station through a third optical cable, the third field arrangement management base station is connected with a second field management base station through a first cable, the second field arrangement management base station is connected with a first field arrangement management base station, the fourth field arrangement management base station is connected with a fifth field arrangement management base station, and the fifth field arrangement management base station is connected with a sixth field arrangement management base station, and one end of the first field arrangement management base station is connected with a sixth acquisition station and a first acquisition station. A data relating and overlapping function, a quality control analysis function and other data processing functions of a central recording unit of a current mainstream wired telemetry seismograph are distributed into the field arrangement management base stations, and the data processing burdens of the central recording unit are greatly relieved.

Description

technical field [0001] The invention relates to a field arrangement management base station and a method of a wired telemetry seismograph, and belongs to the technical field of seismic data acquisition for exploration and development of oil, natural gas and coal resources. Background technique [0002] At present, all mainstream wired telemetry seismometers, whether it is the 400 series of the French SERCEL company, the Uniq system of the American WesternGeco company, or the G3i instrument of the INOVA company of Dongfang Geophysical Prospecting Holdings, all send the data collected in the field to the central recording unit. (located in the instrument cabin) to centrally perform various processes such as calibration, arrangement, denoising, correlation, superposition, quality control analysis, etc., which makes the performance of the instrument host always appear to be stretched, and it always appears that it cannot meet the massive data. High-speed, real-time processing ne...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G01V1/20G01V1/22G01V1/28
Inventor 罗福龙夏颖成新选
Owner BGP OF CHINA NAT GASOLINEEUM CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products