The invention provides an efficient cooperative construction method, device and equipment for simultaneous operation of multiple
geophysical prospecting teams, relates to the technical field of seismic
prospecting, and aims to solve the problem that the construction efficiency is low under the condition that the distance between shot points constructed by the multiple
geophysical prospecting teams in the same time window in adjacent work areas is smaller than the
minimum distance of synchronous excitation in the prior art. The method comprises the following steps: integrating adjacent work areas for analysis, calculating the
lower limit value of the root-mean-square energy of the upper cannon interference of a conventional production cannon, and drawing a first
time distance curve meeting the condition that the upper cannon interference is not greater than that of the production cannon by utilizing a single-cannon data single-cannon energy attenuation time-space domain distribution plane graph of a long-
record long-arrangement-point test; according to the seismic data of the work area, obtaining the lowest refracted
wave speed, and calculating a second
time distance relation curve when the last shot refracted wave does not enter the
single shot data; and an area clamped by the first gun loading interference
time distance curve and the second gun loading interference time
distance curve is used as a distance range of staggered excitation of two guns in adjacent work areas, a blasting time interval is dynamically calculated, and staggered excitation is carried out.