The invention discloses a field arrangement management
base station and method of a wired
telemetry seismograph, and belongs to the technical field of seismic
data acquisition of exploration and development of the
petroleum resource, the
natural gas resource and the
coal resource. A seismograph mainframe
system is connected with a third field arrangement management
base station through a second cable and connected with a fourth field arrangement management
base station through a third optical cable, the third field arrangement management base
station is connected with a second field management base
station through a first cable, the second field arrangement management base
station is connected with a first field arrangement management base station, the fourth field arrangement management base station is connected with a fifth field arrangement management base station, and the fifth field arrangement management base station is connected with a sixth field arrangement management base station, and one end of the first field arrangement management base station is connected with a sixth acquisition station and a first acquisition station. A data relating and overlapping function, a
quality control analysis function and other
data processing functions of a central recording unit of a current mainstream wired
telemetry seismograph are distributed into the field arrangement management base stations, and the
data processing burdens of the central recording unit are greatly relieved.