Double-amplitude type hybrid construction method for underground engineering
An underground engineering, double-width technology, applied in water conservancy projects, infrastructure engineering, artificial islands, etc., can solve the problems of short road closure time, difficult joint processing, and difficult construction excavation, so as to achieve high construction efficiency and eliminate quality Hidden dangers, the effect of ensuring construction safety and project progress
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0050] The following embodiments will further illustrate the present invention in conjunction with the accompanying drawings.
[0051]Assuming that the width between the road sidewalk side stones is 30m, divide the 30m into A, B, and two sections. The specific width of each section can be adjusted according to the road width. First construct section A, and leave section B to ensure two-way four-lane traffic; then For construction section B, leave section A to ensure two-way four-lane traffic; in order to ensure sufficient working surface, 1 meter of sidewalk can be temporarily borrowed respectively.
[0052] The construction machinery and equipment used are as follows:
[0053] Diaphragm wall grooving machine, bored pile drilling rig, crawler crane, truck crane, electric welding machine, steel bar processing machinery, submersible pump and mud pump, concrete vibrating machine, etc.
[0054] Specifically include the following steps:
[0055] (1) Divide the construction ground...