Combined Construction Method for Preventing Gas Leakage and Floor Drum Deformation of Coal-bearing Seam Floor in Coal Mine
A coal seam floor and construction method technology, applied in gas discharge, mining equipment, earthwork drilling and mining, etc., can solve problems such as reduced efficiency, joint gas management, and increased costs, so as to improve construction efficiency, reduce mining costs, and ensure mining safety Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] The technical solution of the present invention is clearly and completely described below in conjunction with reference numerals, those skilled in the art can carry out various changes and modifications to the present invention without departing from the spirit and scope of the present invention, if these modifications and modifications of the present invention belong to the present invention Within the scope of the claims and equivalent technologies, the present invention also includes these changes and modifications.
[0020] A joint construction method for preventing gas leakage and floor drum deformation of the coal-bearing seam floor of a coal mine. The specific construction steps are as follows:
[0021] (1) Use a drilling rig at the bottom corner of the two sides of the roadway, such as figure 1 and figure 2 As shown, drill holes to the outside of the roadway along the direction at an angle of 45°-60° to the bottom plate, and at the same time drill two holes at...