A kind of treatment method for leakage of slurry from slot hole of anti-seepage wall

A treatment method and anti-seepage wall technology, which is applied in earthwork drilling, wellbore/well components, sealing/isolation, etc., can solve the problems of loose structure and difficulty in handling slurry leakage in the slots of the anti-seepage wall, and achieve plugging good effect

Active Publication Date: 2017-01-18
GEZHOUBA GROUP FOUND ENG
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The technical problem to be solved by the present invention is to provide a treatment method for grout leakage in cut-off wall slots, which can solve the problem that it is difficult to deal with the grout leakage in cut-off wall slots with low groundwater level, loose structure and serious overhead. Good leakage effect, simple and easy

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A kind of treatment method for leakage of slurry from slot hole of anti-seepage wall
  • A kind of treatment method for leakage of slurry from slot hole of anti-seepage wall
  • A kind of treatment method for leakage of slurry from slot hole of anti-seepage wall

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] Such as figure 1 , figure 2 , image 3 , Figure 4 and Figure 5 As shown, a treatment method for grout leakage in cut-off wall slots, the method comprises the following steps:

[0026] 1) During the construction of the anti-seepage wall, inject pure cement slurry 3 into the hole 1 of the slot 1 that cannot be plugged by conventional methods to ensure the stability of the hole wall and prevent the slot from collapsing;

[0027] 2) Under the condition of cement slurry solidifying the wall, the percussion drilling rig is used for drilling. Since the density of pure cement slurry is greater than that of mud, the pressure of the slurry column formed is also greater than the pressure of the slurry column formed by the mud. During the drilling process, the pure cement slurry 3 Penetrate into the soil layer around the hole wall of slot 1, and fill the overhead layer around the hole wall;

[0028] 3) When the pure cement slurry surface in the slot hole 1 drops to the bott...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a handling method for diaphragm wall slotted hole slurry leakage. The method comprises the steps that (1) neat cement grout is poured into a slotted hole to reach an aperture; (2) a percussion drill conducts drilling; (3) after the surface of the neat cement grout in the slotted hole descends to the hole bottom, cement mortar is poured into the hole to reach the aperture; (4) the percussion drill is continuously adopted for drilling, and the cement mortar and the cement grout form a stone body surrounding the hole wall; (5) in the drilling process conducted in the step (4), when the surface of the cement mortar in the slotted hole descends, cement mortar is continuously supplemented into the hole; (6) when the cement mortar inside the slotted hole approximately reaches initial setting, the cement mortar inside the hole is replaced with drilling mud; (7) after setting is kept for 24 to 48 hours, diaphragm wall slotted hole slurry leakage handling is completed. The handling method for diaphragm wall slotted hole slurry leakage can solve the problem that slotted hole slurry leakage of a deep and thick covering layer diaphragm wall which is low in underground water level, loose in structure and seriously overhead is difficult to handle, and is good in leakage blocking effect and easy to implement.

Description

technical field [0001] The invention relates to a treatment method for grout leakage in slot holes, in particular to a treatment method for grout leakage in slot holes of deep overburden anti-seepage walls with low groundwater level, loose structure and serious overhead. Background technique [0002] When the percussion drilling rig is used to construct the anti-seepage wall in the deep overburden layer with low groundwater level, loose structure and severe overhang, serious slurry leakage accidents often occur in slot holes. If it is not treated in time, it will cause large-scale collapse of the slot. The traditional plugging methods mainly include: (1) supplementing the hole with low-density, high-viscosity high-quality mud for plugging; (2) backfilling the hole with clay, gravel and other materials to repeatedly create holes for plugging. Due to the low groundwater level in the deep overburden layer, the pressure of the slurry column at the bottom of the slot hole is rel...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E21B33/138
Inventor 周昌茂焦家训向云桃张玉莉欧阳小平耿云辉
Owner GEZHOUBA GROUP FOUND ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products