Construction device and construction method of long-span steel beam frame connected platform

A construction device and connection type technology, which are applied to scaffolding, house structure support, house structure support, etc., can solve the problems of high construction cost, heavy construction and dismantling work, long construction period, etc. The effect of construction labor intensity, smooth and safe progress, and reduction of construction costs

Active Publication Date: 2016-06-08
浙江浙建钢结构有限公司
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The construction device and construction method of this prior art have the following defects: the steel pipes and fastener materials that are put into the full hall scaffold at one time are many, the consumption is large, and the construction cost is high; It takes a long time and the construction period is long; moreover, the support is dense and occupies all the space under the large-span steel beam frame connection platform, making the space below unusable for a long time; what's more, the support is high, easy to lose stability, and has great safety Hidden danger
From the above analysis, it can be known that the erection of scaffolding for welding construction requires many steel pipes and fasteners, a large workload, and time-consuming and laborious installation and disassembly. Moreover, the most important thing is that the operation is suspended at high altitude. The actual operation is extremely difficult and the construction speed is slow. , low efficiency and great security risks

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction device and construction method of long-span steel beam frame connected platform
  • Construction device and construction method of long-span steel beam frame connected platform
  • Construction device and construction method of long-span steel beam frame connected platform

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0040] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0041] Such as figure 1 , figure 2 , image 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 As shown, the construction device of the large-span steel beam frame connected platform of the present invention includes a trolley 1 with rollers 23 and two operating car baskets 2 located on both sides of the trolley 1 . Each operating car basket 2 is vertically slidably matched with the trolley 1, that is, the two sides of the trolley 1 are provided with vertical protrusions 15, and the inner side of each operating car basket 2 is provided with a vertical guide groove 16, and each of the trolley 1 The vertical ribs 15 on two sides are slidably fitted in the vertical guide grooves 16 of the operating car basket 2. Two winches 3 are fixed on the top of the trolley 1, and the stay ropes of each winch 3 are fixed to the top of the operating car ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction device and a construction method for a large-span steel beam frame connected platform. The device includes a trolley (1) and an operating car basket (2). (2) top connection; the bottom of the operation car basket (2) is provided with a guide rail (6), and the guide rail (6) is provided with a second electromagnet and a third electromagnet (8); the key of the method is: on the main girder (9 ) or the normal section of the secondary beam unit, the trolley (1) and the two operating car baskets (2) are in the shape of a character to block the main beam (9) or the movement of the secondary beam unit. When the trolley (1) reaches each node, it passes through the hoist (3) Lift the operating cage (2) so that the operating cage (2) is flush with the bottom surface of the trolley (1) to pass through the node. The construction device and construction method can save the consumption of steel pipes and fasteners, reduce construction cost and labor intensity, facilitate and quick operation, shorten the construction period, do not occupy the construction space under the platform, and eliminate potential safety hazards.

Description

technical field [0001] The invention relates to the construction technology of a large-span steel beam frame connected platform in the field of civil engineering, in particular to a construction device and a construction method of a large-span steel beam frame connected platform. Background technique [0002] The large-span (generally refers to the span exceeding 30m) steel beam frame connection platform includes a platform skeleton formed by connecting and fixing multiple parallel main beams and multiple parallel and perpendicular secondary beams to the main beam, the main beam and the secondary beam The top surface is even; each main beam is a complete steel beam, and its two ends are respectively fixed on the surrounding concrete structure that has been poured. Specifically, the surrounding concrete structure refers to the concrete side walls and columns that have been poured. or floor slab, steel corbels are pre-embedded on the surrounding concrete structure, and the two...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E04G3/34E04B1/342
Inventor 张国松赵银海
Owner 浙江浙建钢结构有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products