Prefabricated concrete member, assembled concrete member and fabricating method through straight thread and nut locking anchor grouting sleeve connection
A prefabricated concrete and prefabricated component technology, applied in building components, structural elements, building reinforcements, etc., can solve problems such as low reliability, loss of life and property, and no experience, and reduce the amount of steel and grouting. The effect of saving lives and property damage, materials and costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] In this embodiment, a detailed description will be given by taking the prefabricated concrete components used for vertical connection to form an assembled prefabricated concrete shear wall as an example.
[0038] like Figure 1 to Figure 14 As shown, the assembled concrete shear wall connected by the straight thread and the nut lock anchor grouting sleeve is formed by connecting the prefabricated concrete shear wall with the nut lock anchor grouting sleeve through the straight thread in the cast-in-place zone; here The prefabricated components mentioned above are the upper wall and the lower wall.
[0039]The assembled concrete member that the straight thread is connected with the nut locking anchor grouting sleeve includes the vertical reinforcement 4 of the upper wall, the vertical reinforcement 13 of the lower wall, the vertical reinforcement 4 of the upper wall and the vertical reinforcement 13 of the lower wall Connected to each other through the sleeve 7; the upp...
Embodiment 2
[0052] like Figure 15-16 As shown, in this embodiment, the prefabricated concrete beams connected with the nut lock anchor grouting sleeve, the assembled concrete beams and the practice are similar to those in Example 1, and can be referred to Figure 1-9 . The prefabricated components are prefabricated concrete beams: a prefabricated beam 18 on one side and a prefabricated beam 19 on the other side, and the prefabricated beam 18 on one side and the prefabricated beam 19 on the other side are connected by a sleeve 7 . The difference is that there is no need to set construction holes in the prefabricated beam 18 on one side and the prefabricated beam 19 on the other side, and the cast-in-place belt is directly poured between the prefabricated beam 18 on one side and the prefabricated beam 19 on the other side during grouting; One side of the end also has a plugging pad; a grouting hole and a grouting hole will be set on the sleeve 7 tops placed horizontally, and grouting begi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com