A treatment method for the undercut of coal mine level roadway
A technology of level entry and bottom sill, which is applied in mining equipment, earthwork drilling, wellbore lining, etc. It can solve problems such as difficult engineering, heavy workload, and deformation of surrounding rock, so as to improve the overall bearing capacity, rock strength, The effect of preventing water accumulation again
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] Such as figure 1 Shown, a kind of treatment method of the bottom of coal mine level roadway, comprises the following steps:
[0025] (a) Water plugging: First, two rows of grouting holes 1 are respectively set in the floor rock formations at both ends of a horizontal roadway 4 with a length of 100-150 m. The number of grouting holes 1 is 2, and each row of adjacent grouting holes 1 is arranged at equal intervals along the width of the bottom plate. The depth of grouting holes 1 is 4.5m to 6m; The grouting time of hole 1 is to keep for 10 minutes after reaching the grouting pressure. The grouting sequence: first the middle, then both sides, first the inner side, then the outer side. The grouting pressure is 2-3MPa. 0.7;
[0026] (b) water pumping: after the water blocking operation in step (a) is completed for 24 hours, the water collection hole 2 is arranged in the bottom plate rock layer in the middle of the horizontal roadway 4, and the hole depth of the water colle...
Embodiment 2
[0029] The difference from Example 1 is: the water plugging described in step (a), the grouting time of each grouting hole 1 is kept for 5 minutes after reaching the grouting pressure; the hole depth of the water collection hole 2 in the step (b) 7m and a diameter of 100mm; the distance between adjacent filling grouting holes 3 in step (c) is 20m, the grouting pressure is 2MPa, and the hole sealing length is 1.5m.
Embodiment 3
[0031] The difference from Example 1 is: the water plugging described in step (a), the grouting time of each grouting hole 1 is kept for 15 minutes after reaching the grouting pressure; the hole depth of the water collection hole 2 in step (b) 7m and a diameter of 120mm.
[0032] The so-called water blocking is to set grouting holes at both ends of a horizontal roadway with a length of L and implement grouting (the length of L is determined according to the on-site production permission, usually 100-150m), the purpose is to cut off the horizontal roadway of this section and connect with both sides Water conservancy connection of roadway. Adopt the control method of the bottom of the coal mine level roadway described in the present invention, at first carry out water blocking, the purpose is to cut off the water conservancy connection of this section roadway and the roadway connected on both sides, after grouting, the water conservancy between this section horizontal roadway an...