Simulation control teaching experiment apparatus of aluminium section extruding machining process, and working method
An extrusion processing and experimental device technology, applied in teaching models, educational appliances, instruments, etc., can solve the problem of lack of simulation teaching experimental devices, and achieve the effect of good teaching effect, complete functions, and good promotion and application value.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0017] Embodiment 1 Aluminum profile extrusion process simulation teaching experiment device
[0018] Such as figure 1 , figure 2 It can be seen that the structure of the present invention includes: a feeding unit, a feeding unit, an extruding unit, a heating and forming unit, and a blanking and cleaning unit. Wherein the feeding unit includes a feeding cylinder 1, a feed bin 2, a jacking cylinder 5 and a billet shearing hydraulic cylinder 3, and the heating and forming unit includes a mold clamping cylinder 12, a mold and an ingot holder 10, and the extruding The unit includes a fast-moving cylinder 8, a main hydraulic cylinder 7 and a die head 6. The blanking cleaning unit includes a blanking box 13 and a cleaning and shearing hydraulic cylinder 11. The fast-moving cylinder 8 and the main hydraulic cylinder 7 are respectively fixed by screws. On the die head 6, the feed cylinder 1 communicates with the silo 2, and squeezes the raw material in the silo 2 to the billet shea...
Embodiment 2
[0031] Embodiment 2 The working method of the simulation teaching experiment device for the extrusion process of aluminum profiles
[0032] The working steps of the simulation teaching experimental device for the extrusion process of aluminum profiles are as follows:
[0033] Step 1: Place the materials used in the equipment in the silo 2, and push the materials out through the feeding cylinder 1.
[0034] Step 2: Cut the material into small pieces through the billet shearing hydraulic cylinder 3, and then send the material to the fixed bracket of the feeding unit through the pushing cylinder 4.
[0035] Step 3: Lift the material through the action of the jacking cylinder 5, and then send the material to the storage tank through the fast moving cylinder 8, heat it to about 60°C and keep it for 60 seconds, so that the raw material can reach the form of compression deformation, and then heat The temperature and temperature holding time are determined according to the material. ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 