A construction method and external support technology, applied in the erection/assembly of bridges, bridges, buildings, etc., can solve problems such as adverse effects and secondary effects of V-shaped pier inclined legs, saving construction costs, shortening construction period, and solving root problems. Effects of stress problems
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] A kind of V-shaped pier external support construction method, specifically comprises the following steps:
[0031] 1. Foundation pit backfill and treatment
[0032] Before backfilling, remove the sundries (soil blocks, woven bags, benzene boards, etc.) in the foundation pit. Layered backfill with graded gravel, each layer of backfill thickness ≤ 20cm, layered tamping and rolling, the compaction degree of more than 98% can be filled with the previous layer. After backfilling to the bottom elevation of the designed ground beam (truss foundation), pay attention to the smooth surface.
[0033] 2. Ground beam (truss foundation) construction
[0034] After the backfilling of the cap foundation pit is completed, the surveyors will give the designed construction position of the ground beam (the cross-sectional size is 750×750mm) (the truss is in place), and the construction of steel bars, formwork and concrete shall comply with the requirements of the bridge foundation constr...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com