Method for determining height of overlying stratum water guiding crack zone
A technology of water-conducting fracture zone and determination method, applied in special data processing applications, instruments, electrical digital data processing, etc., can solve problems such as lack of discussion on individual cases and errors in calculation results
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0041] Such as figure 1 As shown, the method for determining the height of the overlying rock water-conducting fracture zone of the present invention comprises the following steps:
[0042] Step 1. According to the layer thickness, bulk density, elastic modulus and tensile strength of each rock layer overlying the coal mining face, judge whether there are main key layers and / or sub-key layers in each rock layer overlying the coal face, and determine the location of the primary key and / or sub-key;
[0043] During specific implementation, in step 1, according to the layer thickness, bulk density, elastic modulus and tensile strength of each rock layer overlying the coal mining face, it is judged whether there are major key layers and / or sub-critical layers in each rock layer overlying the coal face. layer, and the specific process of determining the position of the main key layer and / or sub-key layer is as follows:
[0044] Step 101, according to the formula (q n+1 ) 1 n ) ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com