A horizontal well fixed string multi-parameter combination test rapid water finding string and method
A combined testing and multi-parameter technology, which is applied in surveying, earthwork drilling, wellbore/well components, etc., can solve problems such as long water search period and high construction intensity, and achieve simple operation, convenient construction, and reduced construction safety risks Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] In order to overcome the problems of long water search period and high construction intensity in the existing methods, the present invention provides a fast water search string and method for multi-parameter combined testing of horizontal well fixed pipe strings, which further shortens the water search cycle and improves water search efficiency , which reduces the labor intensity of on-site construction personnel. This method is convenient for construction and operation, and can effectively reduce the cost of testing.
[0027] like figure 1 As shown, a horizontal well fixed string multi-parameter combination test rapid water detection string, including tubing 13, the horizontal section of the tubing 13 is evenly spaced with the first packer 5, the second packer 9, the second packer A second intelligent switch 7 is arranged between the first packer 5 and the second packer 9, and the two ends of the second intelligent switch 7 are respectively provided with a second press...
Embodiment 2
[0035] Based on Embodiment 1, in this embodiment, a plug 1 is connected to the port of the horizontal section of the oil pipe 13 close to the first pressure gauge 2 .
[0036] A lifting device 14 is connected to the vertical section of the oil pipe 13 .
[0037] The lifting device 14 is connected to the internal structure of the device. After the operation is started, injection and removal are all performed by the lifting device 14 .
[0038] The second pressure gauge 6 , the second flowmeter 8 , the first flowmeter 4 , the first pressure gauge 2 , the third pressure gauge 10 and the third flowmeter 12 are all threaded connections with the oil pipes.
[0039] The threaded connection ensures the integration of each flow meter and the oil pipe, ensuring that each flow meter does not miss the measurement number.
[0040] The first pressure gauge 2, the second pressure gauge 6 and the third pressure gauge 10 are JDYQ downhole high-precision electronic pressure gauges.
[0041] T...
Embodiment 3
[0044] Based on the above two embodiments, this embodiment provides a method for quickly finding water through multi-parameter combined testing of a horizontal well without moving a pipe string. The specific steps are:
[0045]1) First preset the switching status sequence of three smart switches on the ground, namely the first smart switch 3, the second smart switch 7 and the third smart switch 11, and complete the self-check operation on the ground to ensure that the three smart switches The device can be opened and closed normally;
[0046] 2) Run the test string into the well, wait for the first packer 5 and the second packer 9 to be lowered to the predetermined position to set and seal each interval, shut down the well after completion and conduct a pressure recovery test for 5 days, Test the pressure recovery of each sealing section;
[0047] 3) After the pressure recovery test is completed, the large-displacement liquid is discharged through the lifting device 14, and t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com