Unlock instant, AI-driven research and patent intelligence for your innovation.

Segmented crawler crane closing and hoisting technology for pile legs of jack-up offshore oil platform

An offshore oil, jack-up technology, applied in transportation and packaging, load hanging components, cranes, etc., can solve the problems of high construction cost, severe equipment shaking, and long construction period, so as to reduce construction cost and speed up construction progress. , the effect of reducing construction costs

Active Publication Date: 2017-03-22
SHANDONG HAIWAN HOISTING ENG CO LTD +1
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] 1) At present, the vertical splicing of pile legs mainly depends on the use of floating cranes above 3000t for hoisting operations. The construction cost is huge and the construction period is long. Satisfies the hoisting tasks of offshore oil platform pile legs, while the floating crane also takes into account construction tasks such as marine rescue and fixed platforms in the South China Sea, which cannot meet the growing domestic requirements for the lifting of jack-up offshore oil platform pile legs
[0004] 2) The traditional pile connection method of pile legs is offshore floating pile connection. Since the jack-up offshore oil platform pile connection method requires relatively floating pile connection, offshore floating pile connection, after the pile legs are hoisted to high altitude, due to the action of sea wind and waves, As a result, the equipment shakes violently, causing great difficulties in the aerial docking of the pile legs. It is difficult to guarantee the docking accuracy and welding quality of the pile legs, and there is a large construction risk
[0005] 3) There are many auxiliary ships and machinery for offshore floating crane hoisting, and the cost of long-distance transportation is huge. In addition, it has been monopolizing the leg hoisting market of jack-up offshore oil platforms, resulting in an increase in the construction cost of jack-up offshore oil platforms, which affects the platform to a certain extent. increase in number
[0006] 4) The offshore pile connection method is commonly used in the world, and the traditional thinking habit of pile leg hoisting has not been broken through, and the feasibility of the land pile connection method has not been considered
[0007] 5) The total height of the pile legs is over 167m. The existing domestic crawler cranes have certain deficiencies in the lifting performance of the pile legs (if the sections are not suitable), which limits the pioneering method of crawler cranes to connect piles on land to a certain extent.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Segmented crawler crane closing and hoisting technology for pile legs of jack-up offshore oil platform
  • Segmented crawler crane closing and hoisting technology for pile legs of jack-up offshore oil platform
  • Segmented crawler crane closing and hoisting technology for pile legs of jack-up offshore oil platform

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0035] Embodiments of the present invention are further described below in conjunction with accompanying drawings:

[0036] Such as Figure 1-Figure 3 As shown, the first step is to launch the jack-up offshore oil platform 5 into place: first, the jack-up offshore oil platform 5 is inserted into piles, and the three pile legs 3 The spud boots are adjusted to 1.5m from the seabed, and cables are used to secure the jack-up offshore oil platform and floating balls and barges are used to adjust the safe distance between the jack-up offshore oil platform and the wharf to be 12m. position and crawler hoisting and seating positions.

[0037] Step 2. Weld the main lifting point 1. Select the hoisting rigging 2: The hoisting point adopts the self-made lifting point on site, which is welded on the inside of the equipment leg. The position of the main lifting point 1 of each leg is 2m-10m away from the top of the leg. The hoisting point position is re-tested before hoisting. The hoisti...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a process for sectionally closing and hoisting pile legs of a self-elevating offshore oil platform through a crawler crane, and belongs to the technical field of equipment hoisting processes. The crawler crane at the corresponding energy level is used for closing the pile legs; the pile legs of the self-elevating platform can be closed on land or closed after entering the sea according to the height difference and the performance parameters of the crawler crane. According to the process, the traditional construction process is changed; the construction cost is reduced; the construction safety is ensured; the construction period is decreased; the crawler crane is used for closing the pile legs, so that the construction cost can be reduced; the hoisting of the pile legs and the azimuth adjusting of the self-elevating platform are integrated and comprehensively managed, thereby accelerating the construction progress.

Description

technical field [0001] The invention relates to a process for closing and hoisting the leg of a self-elevating offshore oil platform with a segmented crawler crane, and belongs to the technical field of equipment hoisting technology. Background technique [0002] At present, my country's offshore oil exploration and development equipment has entered a period of rapid development, and the localization process of offshore oil equipment is also accelerating. After more than half a century of development, self-elevating mobile platforms have accounted for 60% of the total number of the four main offshore platforms. %. Jack-up mobile platforms play an important role in the exploration and development of marine energy. Since 1970, many jack-up mobile platforms have been built in China, and the construction technology has become increasingly mature; there are many domestic and foreign platform and hull construction experience. , In the field of self-elevating mobile platform constr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): B66C23/62B66C1/10
Inventor 于利民张金进柳晓林杜印升夏丙钟凤英马辰飞傅尚云
Owner SHANDONG HAIWAN HOISTING ENG CO LTD