Segmented crawler crane closing and hoisting technology for pile legs of jack-up offshore oil platform
An offshore oil, jack-up technology, applied in transportation and packaging, load hanging components, cranes, etc., can solve the problems of high construction cost, severe equipment shaking, and long construction period, so as to reduce construction cost and speed up construction progress. , the effect of reducing construction costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0035] Embodiments of the present invention are further described below in conjunction with accompanying drawings:
[0036] Such as Figure 1-Figure 3 As shown, the first step is to launch the jack-up offshore oil platform 5 into place: first, the jack-up offshore oil platform 5 is inserted into piles, and the three pile legs 3 The spud boots are adjusted to 1.5m from the seabed, and cables are used to secure the jack-up offshore oil platform and floating balls and barges are used to adjust the safe distance between the jack-up offshore oil platform and the wharf to be 12m. position and crawler hoisting and seating positions.
[0037] Step 2. Weld the main lifting point 1. Select the hoisting rigging 2: The hoisting point adopts the self-made lifting point on site, which is welded on the inside of the equipment leg. The position of the main lifting point 1 of each leg is 2m-10m away from the top of the leg. The hoisting point position is re-tested before hoisting. The hoisti...