Method for applying the physics of equipment located in the horizontal end of a deviated well to a productive hydrocarbon bed
一种水平部分、水平井的技术,应用在石油和天然气产业领域,能够解决底孔渗透性降低等问题
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0016] This method is implemented in the following way. Since the detonation of the calibration line results in plasma formation and radially directed high voltage shock waves, the device to generate periodically directed short pulses is submerged in a horizontal well using a coil former unit. The device consists of a block of storage capacitors arranged in a circular metal container, connected to a control module and a device located at the wellhead, which has a transmission capability of charging and discharging of the storage capacitors, for activating the device, thereby A series of continuous elastic vibrations are generated at predetermined points in the horizontal enclosure.
[0017] In carrying out the method, not only does the device need to be submerged, but some force needs to be used to push the device down, as opposed to working at a vertical well. To do this, a technique called "coiled tubes" is used, which is immersed in a well of oil well pipe wound on a drum,...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


