Construction equipment and method for post-grouting reinforcement of U-shaped pipe in core hole
A technology of construction equipment and construction methods, which is applied in infrastructure engineering, construction, sheet pile walls, etc., can solve the problem that the grouting pressure is difficult to increase in a short time, the grouting effect cannot be achieved, and the grouting cannot be carried out again. problems, to achieve the effect of improving the compactness of the foundation, reducing waste, and improving the grouting effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] This application is based on the understanding of the technical problems existing in the prior art, that is, in the post-grouting reinforcement construction of the pile foundation, if one-time grouting is used, the filling of the grout is not ideal, the expected grouting effect cannot be achieved, and material waste will also be caused .
[0020] In view of this problem, the present application proposes to implement multiple times of grouting during the post-grouting reinforcement construction of the pile foundation. For this reason, the application provides a kind of grouting reinforcement construction equipment after the U-shaped pipe in the core hole, such as figure 2 shown. Among them, there is a concrete pile body 1 in the foundation soil layer 2, and the core hole 3 is drilled from top to bottom along the direction of the concrete pile body 1 in the concrete pile body 1 by using mechanical equipment such as a drilling rig. The core hole 3 needs At least to the ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

