Traffic conflict prediction method based on space-time proximity
A traffic conflict and prediction method technology, applied in the direction of prediction, instrumentation, data processing applications, etc., can solve problems such as insufficient basic data, and achieve the effect of improving the level of safety services, significant measurability and practicability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach 1
[0041] Specific Embodiment 1: A traffic conflict prediction method based on spatio-temporal proximity in this embodiment is implemented according to the following steps:
[0042] Step 1. Based on the space-time proximity, the speed difference and the following distance are used as the two-dimensional evaluation indicators of the conflict severity;
[0043] Step 2. Determine the severity of the conflict according to the two-dimensional evaluation indicators of the following distance and the speed difference;
[0044] Step 3. According to the two-dimensional conflict evaluation index and the determined data of the actual construction area, use the VISSIM simulation software to construct a conflict simulation model, and simulate the traffic flow operation of the construction road section;
[0045] Step 4. According to the simulation results, the traffic conflict prediction based on the space-time proximity is obtained;
[0046] Step 41. Prediction of traffic conflicts based on spa...
specific Embodiment approach 2
[0048] Specific embodiment two: the difference between this embodiment and specific embodiment one is: according to the two-dimensional evaluation index of the following distance and the speed difference described in step two, the determination of the severity of the conflict is realized according to the following steps:
[0049] Step 21, collecting the data of the target road construction area section according to the two-dimensional evaluation index;
[0050] Collect the data of the target road construction area section, obtain the number of conflicts in the construction section, the distribution of the speed difference between the vehicles that constitute the conflict, and the distribution of the following distance, obtain the cumulative frequency distribution curve of the following distance and speed difference, and determine the seriousness of the conflict The threshold value of the degree, in which, the following distance of the accumulative frequency of the following dis...
specific Embodiment approach 3
[0052] Specific embodiment three: what this embodiment is different from specific embodiment one or two is: the data of the collection target road construction zone road section described in step 21, the construction zone road section data comprises the speed limit rule of the construction zone road section, the construction zone road section Length, number of lanes, traffic volume, traffic composition, following distance and speed;
[0053] Among them, the speed limit rules of the road section in the construction area include the speed limit and the position of the speed limit sign on the normal road section in front of the construction area, and the position of the speed limit sign canceled in the termination area; the length of the road section in the construction area includes the length of the warning area, the length of the upstream transition area, the length of the buffer zone, The length of the working area, the length of the downstream transition area, and the length ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com