A method of simulating the buckle relationship of metering points of 35kv line
What is Al technical title?
Al technical title is built by PatSnap Al team. It summarizes the technical point description of the patent document.
A metering point and simulation system technology, applied in the field of metering simulation training in the power system, can solve the problems of inability to fully access and recognize the system, the system is huge, and the efficiency of skill level improvement is low, so as to improve theoretical cognition, improve effect of effect
Active Publication Date: 2018-03-16
STATE GRID CORP OF CHINA +1
View PDF5 Cites 0 Cited by
Summary
Abstract
Description
Claims
Application Information
AI Technical Summary
This helps you quickly interpret patents by identifying the three key elements:
Problems solved by technology
Method used
Benefits of technology
Problems solved by technology
Because the actual on-site system is very large, it is impossible to fully contact and understand the structure and operation of the system, which makes the efficiency of skill level improvement low
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more
Image
Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
Click on the blue label to locate the original text in one second.
Reading with bidirectional positioning of images and text.
Smart Image
Examples
Experimental program
Comparison scheme
Effect test
Embodiment Construction
[0029] In order to make the object, technical scheme and advantages of the present invention clearer, the following in conjunction with the attached Figure 1-4 and specific examples to clearly and completely describe the invention.
[0030] Such as Figure 1-Figure 4 In the embodiment shown, its key technology is (1) adopting virtual load power supply technology to realize the load condition simulation of each metering point; (2) establishing a complete set of 35kV power distribution and electricity metering environment simulation; (3 ) adopts scientific calculation method to control the instantaneous power of each metering point, and realizes the simulation of the buckle relationship of the line.
[0031] Such as Figure 1-Figure 4 As shown, the operation process of this embodiment is as follows:
[0032] Step 1. Build the actual equipment simulation system including the following equipment:
[0033] (1) 1 set of 35kV analog metering screens for realizing the simulation ...
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
PUM
Login to View More
Abstract
The invention discloses a method for simulating measuring point buckling relation of a 35kV line, wherein the method comprises the steps of 1, establishing an actual equipment simulating system; 2, calculating the buckling relation based on a simulating system, and the step comprises the processes of 2-1, setting two feed lines for measuring the load, the load type and instantaneous power of a user, 2-2, calculating the instantaneous power of a common transformer master meter by a PC according to the instantaneous power of a low-voltage user and a line loss rate, 2-3, making an analog power supply which corresponds with the common transformer master meter output the calculated voltage, the current and the phase by the PC, applying the calculated voltage, the current and the phase on the common transformer master meter, 2-4, calculating the instantaneous power and the power factor of a 10kV gateway meter according to a high-voltage side meter, a high-voltage side meter and the instantaneous power of the common transformer user, 2-5, making an analog power supply which corresponds with the 10kV feed line gateway meter output the calculated voltage, the current and the phase by the PC, and applying the calculated voltage, the current and the phase on the 10kV feed line gateway meter, 2-6, calculating the instantaneous power and power factor of a 35kV master meter according to the instantaneous powers of two 10kV feed line gateway meters, and 2-7, making an analog power supply which corresponds with the 35kV master meter output the calculated voltage, the current and the phase by the PC, and applying the calculated voltage, the current and the phase on the 35kV master meter.
Description
technical field [0001] The invention belongs to the field of metering simulation training in electric power systems, and in particular relates to a method for simulating the buckling relationship of metering points of a 35kV line. Background technique [0002] With the construction of the smart grid, the modern grid is becoming more and more complex and intelligent, and the national economic development has an increasing demand for electric energy. The existence of various complex factors will lead to errors in metering and electricity billing, such as: meter failure, metering line failure, current transformer selection mismatch, electricity stealing behavior of electricity customers, etc. It will bring unknown economic losses to the country or electricity customers, and seriously affect the image of power supply companies. Improving the professional knowledge and technical level of the staff has become one of the important tasks of the State Grid Corporation of China. [...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
Application Information
Patent Timeline
Application Date:The date an application was filed.
Publication Date:The date a patent or application was officially published.
First Publication Date:The earliest publication date of a patent with the same application number.
Issue Date:Publication date of the patent grant document.
PCT Entry Date:The Entry date of PCT National Phase.
Estimated Expiry Date:The statutory expiry date of a patent right according to the Patent Law, and it is the longest term of protection that the patent right can achieve without the termination of the patent right due to other reasons(Term extension factor has been taken into account ).
Invalid Date:Actual expiry date is based on effective date or publication date of legal transaction data of invalid patent.