A construction method for a bridge cap
A construction method and bridge technology, applied in the direction of basic structure engineering, construction, etc., can solve the problems that the quality of concrete structures is difficult to be guaranteed, and achieve the effects of ensuring the quality of solidification and hardening, reducing residual stress, and saving the use of materials
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0064] Below in conjunction with accompanying drawing, the present invention is described in detail.
[0065] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
[0066] Examples such as Figure 1-4 as shown,
[0067] A construction method for a bridge cap: comprising the steps in turn:
[0068] A: Stratify the bridge caps to be poured in the vertical direction;
[0069] B: According to the layering of step A, pour the bottom concrete;
[0070]C: After the concrete in step B is solidified, continue to repeat the concrete pouring method in step B, and pour concrete layer by layer until the cap is poured.
[0071] In the step B, during the concrete pouri...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com