A dry-hanging construction method of curtain wall stone material poured with ab glue and resin glue

A stone material dry hanging and construction method technology, which is applied to the processing of walls, building materials, building components, etc., can solve the problems of increased cleaning workers, untimely technology disclosure by decoration companies, and non-standard base construction, etc., so as to save repairs Cost, safe and civilized construction, good decoration effect

Active Publication Date: 2018-03-27
曹颖
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] 1. Garbage, dust pollution, water pollution, cutting machine noise will be generated;
[0007] 2. Iodine tungsten lamp drying stone, cutting machine electricity and other potential safety hazards, affecting the construction of other processes;
[0008] 3. Due to pollution, it will increase the protection of other finished products on the site and increase the number of cleaning workers for cleaning;
[0009] 4. Most of the workers are unskilled, the cutting is repeated many times, and they cannot be done in one step. The repetitive labor of moving around, moving up and down, can not do a few square meters per person a day, and the efficiency is low;
[0010] 5. Part of the stone area is relatively large, but the strength is low. Due to repeated construction, the stone is easy to break, and the stone will be broken if it is serious (for example, when the stone of the office building of Siyang Civic Center is dry-hanging, half of it is broken and damaged. );
[0011] 6. Stone dry-hanging horse pieces are connected with stone materials. Due to the untimely technical disclosure of various decoration companies and non-standard grass-roots construction, there is no unified national standard and construction standard, and there is no lifelong system for construction personnel; and the quality and technical problems of workers make The flatness of the base construction of the wall surface is not up to the standard, the acceptance is unqualified, and the rectification is not timely, which leads to the difficulty of later construction;
[0012] 7. The splints of the stone connection accessories are of different lengths, and a few of the splints cannot reach the length, so they need to be welded and lengthened on site; in addition, the marble glue and AB glue on the back of the stone are connected with the splints, and there is no unified construction technology Standard, the connection solidification construction on the back of the stone, high and low, various, full of patterns, more prominent, there is a small amount of construction, the accessory horse piece is installed under the angle iron, the force point is transferred, how much the horse piece has to bear times the bearing force is the downward vertical pulling force; a small amount of unreasonable construction has great potential safety hazards

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A dry-hanging construction method of curtain wall stone material poured with ab glue and resin glue

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0039] In this embodiment, the method of dry-hanging construction of curtain wall stones poured with AB glue and resin glue, the specific steps of the method are as follows:

[0040] (1) Pre-preparation: In the early stage of the project, the owner and the project department of the decoration company will determine the type and thickness of the stone according to the requirements of the stone design drawings, and find several stone manufacturers to cooperate in the construction according to the amount of work and the construction period;

[0041] (2) Project setting out: According to the requirements of the drawing, the horizontal line and the axis line submitted by the owner, organize the construction personnel and the stone deepening personnel to set out the line together on site, determine the completed surface line of the stone, and complete the surface line by the stone, and the stone according to the requirements of the drawing The thickness of the stone steel frame base ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a construction method for infusion of AB glue and resin glue for a curtain wall stone dry-hanging process. The method comprises the following specific steps: (1) engineer paying-off; (2) stone deepening layout; (3) stone cutting and trial layout on the site; (4) stone processing; (5) stone packaging; (6) horse piece processing; (7) base construction; (8) stone installation; (9) treatment after installation. The construction method provided by the invention has the advantages that by the adoption of the construction method, neither cutting nor grounding is needed on the construction site, noise, dust and water pollution are not caused, and the construction of other processes is not disturbed, so that the management is facilitated, and the safe and civilized construction is really realized; with the adoption of the construction method, only 1 / 5 of labor is needed, the site conditions are mature, materials are completely prepared, and 30-60 stones can be installed by a worker per hour, so that the labor efficiency is improved; the construction method is truly used for product installation, so that the accommodation and round-trip costs of site installation personnel and personnel are greatly reduced, and further, and the engineering expense and the production cost are lowered.

Description

technical field [0001] The invention relates to a construction method of a building decoration curtain wall, in particular to a construction method of using AB glue or resin glue to pour dry hanging curtain wall stone materials. Background technique [0002] With the construction and development of the city, the progress is accelerating day by day, and various architectural styles and related building materials and new decorative materials have entered the market one after another, which has changed the appearance of the city with each passing day. my country has become the world's largest producer and user of building curtain walls, and the decoration of stone curtain walls has occupied a considerable proportion, becoming a major part of high-end decoration and building interior and exterior wall decoration. [0003] At present, the dry-hanging construction of curtain wall stone materials is carried out by the project department, construction team, and stone material manufa...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04B2/88E04G21/14
CPCE04B2/88E04G21/14
Inventor 曹颖
Owner 曹颖
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products