Construction technology of derrick of self-elevating drilling platform
A drilling platform and self-elevating technology, which is applied in the direction of drilling equipment, earthwork drilling and production, support devices, etc., can solve the problems of long and short legs of columns, troubles, excessive well center offset, etc., and achieve the effect of reducing deformation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] Such as figure 2 , image 3 As shown, the connection between the upper column steel 23 and the lower column steel 21 is realized through the upper flange plate 33 and the lower flange plate 22 that are closely attached to each other; first, the upper and lower flange plates are leveled, and then the two flanges are tightly attached Fix it with process bolts 31 and stickers 32; maintain this state during the assembly and welding of column steel and flanges, and remove the process bolts 31 and stickers 32 after the welding operation is completed.
[0034] First, the lower column shaped steel 21 and the lower flange plate 22 are assembled and fixed by spot welding, then the upper flange plate 33 is connected with the lower flange plate 22 through the process bolt 31, and fixed with the sticking plate 32, and finally the upper column shaped steel 23 is connected with the lower flange plate 22. The upper flange plate 33 is fixed by spot welding. The flange plate and the c...
Embodiment 2
[0037] Such as Figure 4 As shown, in step (2), adopt a control method to realize the length of the column and the height of the storey, lay the four columns flat, and adjust the ends of the four columns to be in the same plane, and then draw the reference line and the floor height line as a whole 43. Surplus trimming line 44.
[0038]The bottom flanges 46 of the four pillars in the first section need to be machined and scraped, and the flatness after processing is ≤0.25mm. Place the column section steel 4 of the first section of the derrick on the horizontal plane, adjust the column level to ≤1mm, and the overall flatness of the column bottom flange 46≤0.5mm (that is, the absolute value of the subtraction of any two values in L1~L4≤0.5mm), priority To ensure the overall flatness size, the measurement reference plane 45 should be selected during actual measurement. Install the second section of column section steel 4 on the basis of the first section of column section stee...
Embodiment 3
[0041] Such as Figure 5 As shown, a method for centering the bolt holes is adopted, and the method of bolt connection is generally used between the beam 3 and the column; according to the position of the bolt holes, it is determined whether to choose pre-drilling or on-site drilling; the general working conditions are good, and it is convenient The location of the drilling equipment operation is selected to be equipped with drilling holes on site, and the special location is selected to be installed after pre-drilling.
[0042] When the gusset plate 53 is positioned on the column section steel 4 panel, at first position and weld the gusset plate 53, the cross beam 3 is welded and fixed with the gusset plate 53 by the angle steel fixing frame 54, and then use the magnet drill 52 to drill the bolt holes on the gusset plate 53 on-site. After the holes are completed, use process bolts to fix the angle steel fixing frame 54 and the gusset plate 53. When the gusset plate 53 is loc...