Embodiment 1
[0018] In a plastic electroplating enterprise, the product roughening section adopts standard roughening solution, which contains chromic anhydride (CrO 3 ) 400g / L, and the workpiece is brought out of the plating solution by about 30L / h. Three rinsing tanks 1, one recovery tank 3, glass liquid film evaporation device and two serial adsorption-removal resin devices are configured on site. The three rinsing tanks 1 are respectively It is a primary rinsing tank 101, a secondary rinsing tank 102 and a tertiary rinsing tank 103. An overflow port is provided between the primary rinsing tank 101, the secondary rinsing tank 102 and the tertiary rinsing tank 103. Add from tertiary rinsing tank 103; recovery tank 3 volumes are 1m 3 , the recovery tank 3 is provided with a float level gauge to control the liquid level, and a hydrometer 6 is provided to measure the ion concentration; a hole is provided between the primary rinse tank 101 and the recovery tank 3 to form a recovery channel U...
Embodiment 2
[0020] In a nickel electroplating enterprise, the plating solution contains 200g / L of nickel sulfate, and the workpiece is taken out of the plating solution at about 20L / h. Three rinsing tanks 1, one recovery tank 3, glass liquid film evaporation device and two series adsorption and desodination devices are installed on site. Resin device, three rinsing tanks 1 are respectively a primary rinsing tank 101, a secondary rinsing tank 102 and a tertiary rinsing tank 103, and an overflow The orifices are connected step by step, and new rinsing water is added from the third-stage rinsing tank 103; the recovery tank 3 is provided with a float level gauge to control the liquid level, and a hydrometer 6 is provided for measuring the ion concentration; the first-stage rinsing tank 101 is connected to the A tunnel is provided between the recovery tanks 3 to form a recovery channel for communication. A recovery liquid delivery pipeline is provided between the recovery tank 3 and the evapora...
Embodiment 3
[0022] In a copper electroplating enterprise, the plating solution contains 150g / L copper sulfate, and the workpiece is taken out of the plating solution at about 10L / h. Three rinsing tanks 1, one recovery tank 3, glass liquid film evaporation device and two series adsorption-desodiumization devices are installed on site. Resin device, three rinsing tanks 1 are respectively a primary rinsing tank 101, a secondary rinsing tank 102 and a tertiary rinsing tank 103, and an overflow The orifices are connected step by step, and new rinsing water is added from the third-stage rinsing tank 103; the recovery tank 3 is provided with a float level gauge to control the liquid level, and a hydrometer 6 is provided for measuring the ion concentration; the first-stage rinsing tank 101 is connected to the A tunnel is provided between the recovery tanks 3 to form a recovery channel for communication. A recovery liquid delivery pipeline is provided between the recovery tank 3 and the evaporation...