The method of constructing reservoirs avoiding caves in limestone areas and the reservoir structures constructed therein
A limestone and reservoir technology, applied in construction, hydraulic engineering, sea area engineering, etc., can solve problems such as difficult blockage, large quantity, and construction of reservoirs, and achieve the effects of avoiding search and blockage, increasing economic value, and difficult cultivation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] Such as figure 1 and figure 2 As shown, the present embodiment includes limestone gully landform, and this landform includes the ditch bottom 2 with the thickness of the soil layer 3 exceeding 5 meters and the slopes 1 on both sides of the ditch bottom 2. The specific construction steps are as follows:
[0036] Step 1, flat foundation, excavate a horizontal flat base 4 in one of the slopes 1 , and the flat base 4 is flush with the top surface of the ditch bottom 2 . In this embodiment, it is preferred that the slope 1 of the excavated flat base surface 4 is gentler than the other slope 1 . Moreover, the flat base surface 4 is excavated in a stepped shape during excavation, so that at least one step 6 higher than the flat base surface 4 is formed on the slope portion 1 of the excavated flat base surface 4 . The horizontal step surface of the step 6 is 5-10 meters wide, and a green belt 7 is set on the side of the horizontal step surface of the step 6 close to the foun...
Embodiment 2
[0044]Such as figure 2 As shown, this embodiment includes a limestone gully landform, which includes a ditch bottom 2 with a soil layer 3 thicker than 5 meters and slopes 1 on both sides of the ditch bottom 2 . A horizontal flat base surface 4 is provided at the lower part of one of the slope portions 1 , and the slope portion 1 on which the flat base surface 4 is provided is gentler than the slope shape of the other slope portion 1 . The flat base surface 4 is flush with the top surface of the ditch bottom 2, and a downwardly recessed reservoir foundation pit 5 is provided on the flat base surface 4, and the inner wall of the reservoir foundation pit 5 is covered with a sealing layer 9. When the reservoir foundation pit 5 spans a plurality of limestone layers, and there is a water gap in the inner wall of the reservoir foundation pit 5 (the water gap is the soil layer between the limestone layers), the sealing layer 9 is 20-40 cm thick concrete layer, the preferred concrete...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com