A kind of main chute plugging method
A main chute and chute technology, applied in the fields of rock mechanics and mining engineering, can solve the problems of long construction period, low construction efficiency, secondary instability and collapse, etc., and achieve low construction cost, short construction period and high construction safety. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0015] The following clearly and completely describes the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0016] like figure 1 As shown, the embodiment of the present invention provides a high-efficiency main chute plugging method under non-evacuation conditions, which can safely, efficiently and economically block the abandoned part of the upper part of the main chute and ensure the normal use of the main chute at the lower part of the plugging structure. The blocking structure mainly includes:
[0017] (a) Replace the ore in the upper part of the main chute to be abandoned in the shaft with reasonable graded stone aggrega...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

