Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A construction method for pipe jacking in silt soil stratum

A construction method and silt soil technology, applied in pipeline laying and maintenance, pipes/pipe joints/fittings, mechanical equipment, etc., can solve problems such as increased frictional resistance, poor arching, and top line deviation

Active Publication Date: 2018-04-10
中铁二十局集团第五工程有限公司
View PDF8 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Since the sand layer where the depth of the pipe jacking position is located in the above project is the full-section silt layer with high water content and poor arching performance, it must be considered that the sand layer on the top of the pipe is completely pressed on the top of the pipe during jacking, resulting in positive pressure, The frictional resistance caused by the lateral pressure increases; at the same time, it is easy to appear "heading" and top line deviation during jacking of the saturated sand layer
In the process of adopting the traditional pipe jacking construction mode (i.e. manual hand digging pipe jacking construction), when a large amount of silt layer is encountered, it is easy to collapse and construction cannot be carried out. Therefore, it is necessary to improve the traditional pipe jacking construction method

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A construction method for pipe jacking in silt soil stratum
  • A construction method for pipe jacking in silt soil stratum
  • A construction method for pipe jacking in silt soil stratum

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0086] like figure 1 A kind of pipe jacking construction method in silt soil stratum shown, comprises the following steps:

[0087] Step 1, working well construction: construct the working well 1 for jacking the constructed underground pipeline, the working well 1 is located at the rear side of the constructed underground pipeline, and the constructed underground pipeline is located between the working well 1 and the receiving well , see Picture 1-1 ;

[0088] like Picture 1-1 As shown, the underground pipeline to be constructed is a spliced ​​pipeline that is spliced ​​from front to back by a plurality of pipeline assembly sections 6 and buried in the silty soil stratum, and among the plurality of pipeline assembly sections 6 located at the front 6 is a front-end assembly section, and among the multiple pipeline assembly sections 6, the pipeline assembly section 6 located at the rear end is a rear-end assembly section; the underground pipeline constructed is a water supp...

Embodiment 2

[0193] In this example, if Figure 5 As shown, the difference from Example 1 is that the support ring 2-2 in step 1 is a steel ring, and the support ring 2-2 is a thin support ring with a thickness of 0.8cm to 1.2cm, and the thin support ring A plurality of triangular stiffeners 2-4 are provided along the circumferential direction on the front side of the front side, and the outer sides of the triangular stiffeners 2-4 are fixed on the inner side wall of the steel casing 2-1.

[0194] In this embodiment, the thickness of the supporting ring 2-2 is 1 cm.

[0195] In actual use, the thickness of the support ring 2-2 can be adjusted accordingly according to specific needs.

[0196] Moreover, both the support ring 2-2 and the socket 2-3 are processed and manufactured as a whole with the steel casing 2-1.

[0197]In this embodiment, the rest of the method steps are the same as in Embodiment 1.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a pipe-jacking construction method for a mealy sand stratum. The pipe-jacking construction method for the mealy sand stratum comprises the steps that firstly, a working well is constructed, specifically, the working well used for jacking a constructed underground pipeline is constructed, the constructed underground pipeline is formed by splicing a plurality of pipeline assembly sections from front to back, and a steel bushing head tool pipe comprises a steel sleeve, a supporting ring mounted on the inner side of the rear end of the steel sleeve, and an insertion opening fixed to the supporting ring; secondly, jacking equipment is mounted, specifically, the jacking equipment is mounted at the bottom of the inner side of the working well; thirdly, the steel bushing head tool pipe is jacked through the process that the steel bushing head tool pipe is hoisted in place, the steel bushing head tool pipe is jacked, and manual intra-pipe earth cutting is conducted; fourthly, the pipeline is jacked, specifically, the multiple pipeline assembly sections of the constructed underground pipeline are jacked from front to back; fifthly, a pipeline port is treated; and sixthly, a closed water test for the pipeline is conducted. According to the pipe-jacking construction method for the mealy sand stratum, the steps are simple, the design is reasonable, construction is easy and convenient, and the using effect is good; and a pipe-jacking construction process of the mealy sand stratum can be completed easily, conveniently and rapidly, and the construction process is safe and reliable.

Description

technical field [0001] The invention belongs to the technical field of underground pipeline construction, and in particular relates to a construction method for pipe jacking in silty soil layer. Background technique [0002] The pipe jacking method refers to a kind of underground excavation construction method used when tunnels or underground pipelines cross various obstacles such as railways, roads, rivers or buildings. During construction, the pipe is pressed into the soil layer with the hydraulic jack supported on the back seat of the foundation pit through the force transmission jack iron and the guide rail, and the soil on the front of the pipe is excavated and transported away at the same time. After the first section of pipe is fully pushed into the soil layer, then the second section of pipe is connected to the back and continues to be jacked, so that the section of pipe is pushed in, the interface is made, and the culvert is built. Working wells are generally used ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): F16L1/028
CPCF16L1/028
Inventor 王晓峰吴光华李任马志强
Owner 中铁二十局集团第五工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products