Improving method and system for lean management of multi-cycle integrated outage plan of large power grid
A technology of power outage planning and large power grid, applied in system integration technology, information technology support system, computing, etc., can solve problems such as repeated power outages, reciprocating power outages, and increase in the number of power equipment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] In view of the characteristics of extensive management of power outage plans for main equipment of the power grid and the increasingly complex structure of the power grid, the present invention obtains the data of the main equipment of the power outage plan and the corresponding work content of power outages through declaration, extracts the topological structure of the power grid to determine the upstream and downstream relationships and positive and negative correlations, and based on clean energy Based on the base output forecast and historical power flow data information, a large power grid multi-period integrated power outage plan management model based on power grid topology and compliance with safe operation regulations and clean energy consumption is constructed, which effectively improves the clean energy consumption rate and the use of main grid equipment rate to ensure the safe and efficient operation of the power grid.
[0044] The method of the present inven...
Embodiment 2
[0060] Based on the same idea, the present invention also provides a lean management improvement system for multi-period integrated power outage planning of large power grids, including:
[0061] Centralized declaration module 10: used by blackout planners to make centralized declarations for equipment plans to be cut off;
[0062] Construction period determination module 20: used to analyze the power outage planning process and optimize the construction period according to the cause of the power outage;
[0063] Merging and bundling module 30: used for merging and bundling the power outage plan documents that have passed the audit of the length of the construction period;
[0064] Approval module 40: for approving the merged and bundled power outage plan documents;
[0065] Optimization module 50: used to automatically optimize the power outage plan declaration documents;
[0066] Review module 60: used to manually review and publish the optimization results;
[0067] Moni...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com