A technology of gravel and stone layers, which is applied in the field of grouting devices for foundation anti-seepage treatment projects with deep sand and gravel covering layers, can solve problems such as low construction efficiency, high cost, stuck drill pipes and cast pipes, etc. The effect of high work efficiency and reduced labor intensity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] Such as figure 1 As shown, a grouting device for a deep sand and gravel layer includes a grouting pipe formed by threaded connection of multiple steel flower pipes 1, and a grout hole ring 2 composed of a plurality of grout holes is provided at intervals on each steel flower pipe 1. Each grout hole ring 2 is provided with a rubber hoop 4, and the two ends of the rubber hoop 4 are fastened on the steel flower pipe 1 through a limit fixing component. Lan Pan7.
[0035] The multi-segment steel flower pipes 1 are threadedly connected by threaded joints 3 to form grouting pipes.
[0036] In the limit fixing component, the two ends of the rubber hoop 4 are respectively provided with the limit hoop 5, and the two ends of the rubber hoop 4 are fixed with the limit hoop 5 through the transparent tape 8, so as to prevent the rubber hoop 4 from being installed under the entire grouting device. displacement occurs.
[0037] The distance between the two slurry outlet rings 2 on e...
Embodiment 2
[0042] Such as figure 2 Shown, a kind of method utilizing above-mentioned device to carry out comprehensive grouting of gravel layer, this method comprises the following steps:
[0043] Step 1: Drill the casing with a diameter of 146 mm to more than 60 meters to 80 meters with a follow-up drilling rig, pour filler into the drill hole to form a filler layer 9, and then install the steel flower pipe section with the bottom sealing plate 6 at the bottom into the drilled hole;
[0044] The filler should be continuously injected from the bottom of the hole through the catheter, and there should be no pause in the middle. The injection time of the filler should not exceed 1 hour. Filling can only be ended when it is full.
[0045] Step 2: Connect the multi-segment steel flower tubes 1 section by section in the form of threaded connection, put them into the drilled hole and splice them with the steel flower tube sections with the bottom sealing plate 6 installed at the bottom to f...