Prefabricated steel-concrete composite structure bridge and its construction method
A combined structure and concrete technology, which is used in the erection/assembly of bridges, bridges, bridge parts, etc., can solve the problems that the combined stress effect is not as uniform as the shear nails, the difficulty of installing prefabricated panels, and the increase in the amount of concrete poured in place. To achieve the effect of reasonable force, improve construction quality, fast and simple construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 2
[0047] Embodiment 2: as Figure 4~6 As shown, in this embodiment, a gap of 100-300 mm is left between the two longitudinal ribs 7 connected together, the longitudinal ribs are L-shaped, and the web 11 of the L-shaped longitudinal ribs is provided with bolt holes, The longitudinal ribs between two adjacent composite beams are connected together by connecting steel plates 12 and bolts 9, and the connecting steel plates 12 and the webs 11 are connected by bolts 9; The steel cage 13 between the two longitudinal ribs is also poured with joint concrete 10, and the longitudinal rib 7 is welded with a shear connector 3 that connects the joint concrete and the upper flange steel plate, When the bridge deck is wide, the gap between the longitudinal ribs forms small longitudinal beams, which is conducive to the stress on the main beam and reduces the construction amount of concrete wet joints.
[0048] The construction method of the assembled steel-concrete composite structure bridge in...
Embodiment 3
[0049] Example three: as Figure 7 As shown, the difference between this embodiment and the first embodiment is that the structure of the longitudinal rib is different, and the lower side of the longitudinal rib also has a web 11 bent inward at 90°, so that the longitudinal rib forms an L-shaped structure.
Embodiment 4
[0050] Example four: as Figure 8 As shown, the difference between this embodiment and the second embodiment is that the cross-section of the steel beam in this embodiment is a box-shaped cross-section.